ELE04-03582
| Electrical Rough-In | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | A | PASS |
|
|
cover inspection only////richard; Phone #: ###-#### Internet Inspection Request from: Barbara Moore inside cover ok, met contractor and looked at using stack-its and some stapling. Service will be on back bldg, not main house. 11/30/2004 9:21:34 AM
|
ELE04-03725
| Final | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | A | FAIL |
|
|
Chad; Phone #: ###-#### Internet Inspection Request from: Jan Rice 110.12(C) There shall be no damaged parts (50A recpt.), Job id shall be posted. Called contr and he will call again when ready 11/30/2004 10:04:02 AM
|
ELE04-03728
| Permanent Service | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | A | PASS |
|
|
WE ARE READY FOR A FINAL INSPECTION OF THE SERVICE UPGRADE ON THIS PROJECT. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH 11/30/2004 8:11:00 AM called contractor and told that the panel schedule needs to be done. They will do today. ok to final. 11/30/2004 8:12:48 AM
|
ELE04-03520
| Final | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | A | PASS |
|
|
READY FOR FINAL INSPECTION OF THE BATHROOM AND SMOKES INSTALLED. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final. 11/30/2004 8:24:50 AM
|
ELE04-03465
| Final | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: joe wheeler ok to final 11/30/2004 1:22:44 PM
|
ELE04-03703
| Rough-In Permanent Service | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
Internet Inspection Request from: Bob Glenn called contractor and told recorder that there was a box to be made up upstairs. ok to cover. p/s u/g n ok 11/30/2004 3:23:14 PM
|
ELE04-02756
| Final | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 7:43:25 AM. Contact: ###-####. ok to final 11/30/2004 2:57:01 PM
|
ELE04-03662
| Electrical Rough-In | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 7:44:33 AM. Contact: ###-####. in K2 offices, new wall on south and west and office area on south of existing office areas. cover ok for walls and ceiling. 11/30/2004 12:45:53 PM
|
ELE04-03675
| Rough-In Permanent Service | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
allen; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover walls and ceiling, p/s u/g n ok 11/30/2004 1:50:56 PM
|
ELE04-03396
| Temporary Service | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 10:04:42 AM. Contact: ###-####. called contractor, he couldn't read his permit number too well. told him to verify and recall. The number he used is for Spencer Elect. and the job is on Tottenham. He wanted t/s on broadway. 11/30/2004 4:21:55 PM
|