BLD04-02374
| BLD-Final | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | FAIL |
|
|
dave thomas ###-####
left c/n on site 11/30/2004 2:31:05 PM
|
MIS04-00300
| BLD-Final | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
permanent occupancy ok. 11/30/2004 1:40:48 PM
|
BLD04-01192
| BLD-Conference | 11/29/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PART |
|
|
david; Phone #: ###-####2 Internet Inspection Request from: Barbara Moore
one layer 5/8 type x drywall @ gable end fill framing above wall 11/30/2004 2:50:28 PM
|
BLD04-02189
| BLD-Framing/Rough-in | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 10:57:11 AM. Contact: ###-####.
ok to insulate 11/30/2004 3:36:39 PM
|
BLD04-01437
| BLD-Final | 11/30/2004 | 11/30/2004 | 11/30/2004 12:00:00 AM | P | PASS |
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|