Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-01865 FIRE-Final Inspection11/30/200611/30/200612/1/2006 4:27:27 PMPPART
A temporary occupancy was given with Dave Hannimans permission until the two exit signs as discussed are installed or plans are resubmitted showing the deletion of the curtain.
FIR06-00885 INSP-Alarm Testing11/30/200611/30/200612/1/2006 4:26:17 PMPPASS
Permit finaled.
BLD05-01990 FIRE-Final Inspection11/30/200611/30/200611/30/2006 4:48:07 PMPCANC
No inspection performed. See correction notice left for 1201for a starting point for items in this building.
BLD05-01989 FIRE-Final Inspection11/30/200611/30/200611/30/2006 4:47:52 PMPCANC
No inspection performed. See correction notice left for 1201for a starting point for items in this building.
BLD05-01991 FIRE-Final Inspection11/30/200611/30/200611/30/2006 4:46:34 PMPFAIL
Provide 20 minute doors with closers as required, provide notes, provide striping or signage as required, relocate smoke detectors and connect to the others as required and provide verification of the exit discharge lighting as discussed. Need to test all of the smoke alarms in the building.
MIS06-00319 FIR-Final11/29/200611/30/200611/30/2006 3:30:45 PMAPASS
Life safety finaled
FIR06-00939 INSP-Sprinkler Rough-in11/29/200611/30/200611/30/2006 3:19:57 PMPPASS
Underground supply line is ok to cover
BLD06-02129 FIRE-Final Inspection11/29/200611/30/200611/30/2006 2:17:12 PMACANC
Per contractor this has already been rescheduled for tomorrow due to some missing fire extinguisher brackets. No inspection performed.
FIR05-00536 INSP-Sprinkler Rough-in/Hydro11/29/200611/30/200611/30/2006 2:15:45 PMAPASS
The hydro test for the north tower 6th floor mechanical area is passed.
BLD06-01993 FIRE-Final Inspection11/29/200611/30/200611/30/2006 12:49:58 PMAFAIL
Provide approved door hardware on the restroom door and fix the exit sign at the main exit.
BLD05-02151 FIRE-Final Inspection11/29/200611/30/200611/30/2006 12:34:36 PMAPASS
Life safety finaled. See entry from Sam Rogers pertaining to the battery capacity. All other items ok.
FIR06-00571 INSP-Final Inspection11/29/200611/30/200611/30/2006 11:43:07 AMAFAIL
Showed up for inspection but found that not all of the smoke detectors had been installed. No test performed.
FIR05-00270 INSP-Supply line flush11/29/200611/30/200611/30/2006 11:36:05 AMACANC
bryan was unable to do the flush today
FIR05-00271 INSP-Supply line flush11/29/200611/30/200611/30/2006 11:35:43 AMACANC
bryan was unable to do the flush today
FIR05-00270 INSP-Sprinkler Rough-in/Hydro11/29/200611/30/200611/30/2006 11:34:59 AMAPASS
Underground hydro test passed
FIR05-00271 INSP-Sprinkler Rough-in/Hydro11/29/200611/30/200611/30/2006 11:34:38 AMAPASS
Underground hydro test passed.
FIR06-00932 INSP-Final Inspection11/30/200611/30/200611/30/2006 11:15:00 AMPPASS
permit finaled
FIR06-00560 INSP-Final Inspection11/29/200611/30/200611/30/2006 10:26:18 AMAFAIL
Not all of the ceiling tile has been installed
BLD06-00981 FIRE-Final Inspection11/29/200611/30/200611/30/2006 10:03:32 AMPFAIL
I tried to do inspection this morning but no approved plans are on site and the secondary exit across the roof has not been completed. Inspection will be rescheduled for tomorrow.
BLD06-03301 FIRE-Final Inspection11/29/200611/30/200611/30/2006 9:01:16 AMAFAIL
Provide "Maximum storage height of 14'-0
" signage for all of the racks as discussed.
FIR06-00623 INSP-Sprinkler Rough-in11/29/200611/30/200611/30/2006 8:19:11 AMAPART
The sprinkler piping in 13905, morris dentist is ok to cover