Inspections for the day of: Friday, November 30, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00079 FIRE-Final Inspection11/30/200711/30/200712/4/2007 5:12:32 PMPFAIL
Need to verify functional EM lighting.
BLD04-01308 FIRE-Final Inspection11/30/200711/30/200712/4/2007 5:11:44 PMPFAIL
Need to verify functional EM lighting at all three stairways, provide signage at the gates to the basement level in the stariways, remove covering at a fire sprinkler head in the south stairway 1st floor exit discharge.
FIR07-00737 INSP-Sprinkler Rough-in/Hydro11/30/200711/30/200711/30/2007 2:44:09 PMPPART
See approved plan set for areas inspected today.
FIR07-00913 INSP-Sprinkler Rough-in/Hydro11/30/200711/30/200711/30/2007 2:43:18 PMPPART
Red lined areas on the plan at the basement level okayed for ceiling cover.
FIR07-00450 INSP-Final Inspection11/28/200711/30/200711/30/2007 2:42:14 PMAFAIL
Noted several locations in need of av notification adjustment, some devices are missing, incorrect cd settings, blocked or obstructed, red lined areas on plans, discussed inspection scheduling.
FIR06-00504 INSP-Final Inspection11/29/200711/30/200711/30/2007 12:57:47 PMAPART
Items on correction notice are complete with the exception of four missing DP heads, need to provide coverage for an open space at the 1st floor or completely enclose as indicated on the building plans to create a non-combustible concealed space, repair the flow switch at the pump discharge manifold, ceiling tiles at some locations are still missing.
FIR07-00772 INSP-Sprinkler Rough-in/Hydro11/29/200711/30/200711/30/2007 11:57:24 AMPPART
Scheduled by a contractor via Hello! on 11/29/2007 at 5:00:15 PM. Contact: ###-####. Noted two pendent heads at the east side have been changed to QR as discussed. Sprinkler final pending removal of tape at covered uprights and escutcheons at hard lid ceilings when painting and sheetrock patching is completed. Contact phone number is incorrect, line has been disconnected.
FIR07-00481 INSP-Final Inspection11/29/200711/30/200711/30/2007 11:36:43 AMAPASS
Sprinkler finaled.KR
BLD06-03088 FIRE-Final Inspection11/30/200711/30/200711/30/2007 10:43:02 AMPPASS
Corrections have been verified for compliance, fire life safety finaled.
FIR07-00441 INSP-Final Inspection11/29/200711/30/200711/30/2007 10:42:05 AMAPASS
Corrections verified, resubmittals for as-built plans accepted, final inspection passed. NFPA 72 record of completion forms to be delivered to PDS fire office today for signature as agreed.
BLD07-02538 FIRE-Final Inspection11/29/200711/30/200711/30/2007 9:53:15 AMAPASS
Fire life safety is acceptable per scope of work, noted missing hardware at the door to the display room to be verified for code compliance at structural final.
BLD06-03088 FIRE-Final Inspection11/30/200711/30/200711/30/2007 9:51:58 AMAPEND
FIR07-00845 INSP-Final Inspection11/29/200711/30/200711/30/2007 9:48:46 AMAPASS
Fire sprinkler final inspection passed, permit finaled.
BLD07-01605 FIRE-Final Inspection11/29/200711/30/200711/30/2007 9:24:48 AMAFAIL
Need to remove one sprinkler head were a wall was taken down. to close to another head .head is not required for coverage.KR
FIR07-00471 FIR-Aging Inspection11/30/200711/30/200711/30/2007 8:57:14 AM DEFR
wip