Inspections for the day of: Monday, November 30, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00435 Site Final11/25/200911/30/200912/1/2009 10:15:16 AMAPASS
ESC09-00682 Site Preparation11/24/200911/30/200911/30/2009 3:30:48 PMAPASS
Work completed but di bags need to be removed.
ESC09-00751 Site Preparation11/30/200911/30/200911/30/2009 3:25:23 PM PASS
ESC08-00660 General Inspection11/30/200911/30/200911/30/2009 3:24:50 PM DONE
ESC08-00660 DOC - Permit Finaled11/30/200911/30/200911/30/2009 3:24:32 PMPPASS
ESC09-00721 Complaint Inspection11/30/200911/30/200911/30/2009 3:05:48 PMAPART
Went over detail regarding there dewatering operation and what they are required to meet prior to them discharging into the MS4 system on Parkcenter Blvd. Must not allow any turbid water into the storm drain where discharge point is located. Also must submit a dewatering plan to city of boise for review. Will re-inspect on 12/1/09AM.
ESC09-00203 Tracking Control11/30/200911/30/200911/30/2009 2:42:33 PMPFAIL
Verbal to RP:
1.Clean up all tracking onto the road.
2. Extend the construction exit to the north by at least 25-30ft with a geotextile fabric underneath the washed rock.
3. Maintain construction exit.
Will re-inspect on 12/2/09 AM
ESC09-00511 BMP Violation11/27/200911/30/200911/30/2009 2:15:44 PMAFAIL
Correction Notice: (message to RP)
1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot.
2. Clean up all trackng off of lot onto hard surface.
3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking.
Failure to comply will result into further enforcement.
Will re-inspect on 12/2/09PM.
ESC09-00510 BMP Violation11/27/200911/30/200911/30/2009 2:08:43 PMAFAIL
Correction Notice: (message to RP)
1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot.
2. Clean up all trackng off of lot onto hard surface.
3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking.
Failure to comply will result into further enforcement.
Will re-inspect on 12/2/09PM.
ESC09-00509 BMP Violation11/27/200911/30/200911/30/2009 2:08:22 PMAFAIL
Correction Notice: (message to RP)
1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot.
2. Clean up all trackng off of lot onto hard surface.
3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking.
Failure to comply will result into further enforcement.
Will re-inspect on 12/2/09PM.
ESC09-00508 BMP Violation11/27/200911/30/200911/30/2009 2:08:11 PMAFAIL
Correction Notice: (message to RP)
1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot.
2. Clean up all trackng off of lot onto hard surface.
3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking.
Failure to comply will result into further enforcement.
Will re-inspect on 12/2/09PM.
ESC09-00752 Site Preparation11/30/200911/30/200911/30/2009 1:24:53 PM NR
ESC09-00714 Site Preparation11/23/200911/30/200911/30/2009 8:44:36 AMANR