BLD11-02650
| FIRE-Conference | 11/30/2011 | 11/30/2011 | 11/30/2011 3:46:13 PM | P | DONE |
|
|
Pete Draper Phone #: ###-#### Regarding modifications necessary to maintain adequate fire sprinkler coverage due to remodel work.
|
BLD11-02486
| FIRE-Conference | 11/30/2011 | 11/30/2011 | 11/30/2011 3:41:31 PM | P | DONE |
|
|
On site conversation with contractor regarding items needed for fire life safety approvals.
|
FIR11-00620
| INSP-Final Inspection | 11/30/2011 | 11/30/2011 | 11/30/2011 3:39:00 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR11-00528
| INSP-Final Inspection | 11/30/2011 | 11/30/2011 | 11/30/2011 2:18:46 PM | P | PASS |
|
|
Scope of fire alarm permit work finaled. *Note: defficient items including missing smoke detection at leibert units, location of existing notification appliances and items 1 and 2 on the plan review are to remain at this time per building official J. Blais and fire chief R. Gervais.
*The existing switch gear room has been vacated and all electrical equipment and stationary storage batteries have been removed by the tenant. The clean agent fire protection and detection system has been removed under FIR11-00528. The existing fire/smoke rated wall assembly seperating the switch gear room and the mechanical room is no longer required and has been modified and subsequently no longer maintains an approved 1 hour rated assembly. The opening protection seperating the switch gear room and the mechanical room, (smoke dampers), may have been impaired due the removal of the area smoke detection required as part of the clean agent system removal. The mechanical division, building official, and fire code official have approved the 3 air handling units to remain as is, under the condition the space served by the air handling units remains unoccupied. An occupancy permit shall be obtained prior to untilization of the vacated space. *SJA*
|
FIR11-00620
| INSP-Alarm Testing | 11/28/2011 | 11/30/2011 | 11/30/2011 1:58:06 PM | A | PASS |
|
|
Fire alarm work passed functional test and EOL voltage measurements.
|
FIR11-00608
| INSP-Sprinkler Rough-in | 11/29/2011 | 11/30/2011 | 11/30/2011 1:55:43 PM | A | PART |
|
|
Overhead fire sprinkler work approved for cover at the grid ceilings.
|
BLD11-02574
| FIRE-Conference | 11/29/2011 | 11/30/2011 | 11/30/2011 1:55:00 PM | A | DONE |
|
|
On site conference with contractor regarding fire life safety inspection items related to modifications to existing wall locations.
|
FIR11-00630
| INSP-Final Inspection | 11/29/2011 | 11/30/2011 | 11/30/2011 1:51:23 PM | A | PASS |
|
|
Fire alarm work passed inspection. Permit finaled.
|