Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00192 General Inspection11/29/201111/29/2011   
ELE11-00284 ELE-Aging Inspection11/30/201111/30/201112/1/2011 1:36:38 PM DONE
Electrical contractor said they would call for final inspection
ELE11-02562 Electrical Rough-In11/30/201111/30/201111/30/2011 1:22:44 PMPNR
jeff Phone #: ###-#### General contractor requested to cancel rough-in inspection do to not being ready.
ELE11-01406 Rough-In Permanent Service11/29/201111/30/201111/30/2011 1:05:24 PMAFAIL
sched by 415 Was having electrican make corrections as doing inspection walk through on first unit,got beyond 5 violations. NEC 334.30 Shall staple romex within 12 inches of boxes. Not all make ups are completed at time of rough-in inspection,Electrian said well red tag it than!
ELE11-02614 Electrical Rough-In11/30/201111/30/201111/30/2011 12:40:21 PMPPASS
roger Phone #: ###-#### correction done rough-in ok cover basement
ELE11-02688 Final11/30/201111/30/201111/30/2011 11:50:25 AMPPASS
lynn Phone #: ###-#### final ok
ELE11-02688 Electrical Rough-In11/30/201111/30/201111/30/2011 11:49:54 AMPPASS
240 volt 50 ampere hot tub circuit with GFCI protected service outlet rough-in ok cover
ELE11-02692 Electrical Rough-In11/30/201111/30/201111/30/2011 10:49:37 AMPCANC
Contact: Brian Gee - ufer ground inspection by 1:00 please. Pouring at 2:00 Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
ELE11-02645 Temporary Service11/29/201111/30/201111/30/2011 10:01:27 AMAPASS
Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok
ELE11-02675 Electrical Rough-In11/29/201111/30/201111/30/2011 9:35:37 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot rough-in ok cover front entry
ELE11-01878 Electrical Rough-In11/29/201111/30/201111/30/2011 8:57:52 AMAPASS
This is a courtesy inspection to inspect two walls in the electrical room at the Harris Ranch Fire Station #15. Please meet with Matt Suitter Job Foreman Phone #: ###-#### >> Inspection requested via web by chris green rough-in ok cover two walls in electical room south & east walls only
ELE11-02553 Final11/29/201111/30/201111/30/2011 8:26:40 AMANR
Ready to final out the office thanks Phone #: ###-#### >> Inspection requested via web by Brad Baker
ELE11-02625 Electrical Rough-In11/29/201111/30/201111/30/2011 8:12:52 AMAPASS
Ceiling inspection request. All can lights are installed in hard lid areas. Phone #: ###-#### >> Inspection requested via web by Steve Craig rough-in ok cover hard lid ceilings
ELE11-02682 Electrical Rough-In11/29/201111/30/201111/29/2011 4:07:04 PMAPASS
Please call Mike with questions on what we have done in the space Phone #: ###-#### >> Inspection requested via web by ERIC CENTERS rough-in ok cover