Inspections for the day of: Friday, November 30, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00593 INSP-Final Inspection11/29/201211/30/201211/30/2012 3:51:23 PMAPASS
Permit finaled
FIR12-00628 INSP-Sprinkler Rough-in11/30/201211/30/201211/30/2012 3:34:13 PMPPASS
Could not find approved plans on site. Walls have been installed and the upright sprinkler protection appears to be correct. The two branchlines that were located too close to one another have been modified to increase spacing between the two lines. Painters had many of the heads covered so their removal will need to be verified at the final. Per the project history plans still have not been resubmitted for review and the hydro test is still needed. I left message on Stephen's cell phone to call me back.
FIR12-00687 INSP-Final Inspection11/29/201211/30/201211/30/2012 3:21:45 PMPPASS
Newly modified hood suppression functioned correctly. No alarm point was changed.
FIR12-00680 INSP-Sprinkler Rough-in11/30/201211/30/201211/30/2012 2:13:56 PMPPASS
Underground supply line cover inspection passed. Piping can be covered.
FIR11-00431 INSP-Final Inspection11/30/201211/30/201211/30/2012 1:40:13 PMPCANC
Per james and I's discussion this inspection will be rescheduled for monday. Phone #: ###-####
FIR12-00423 INSP-Sprinkler Rough-in11/29/201211/30/201211/30/2012 11:54:45 AMAPASS
The first floor breeze-way piping can be covered. The heat tape/insulation has been installed.
FIR12-00471 INSP-Final Inspection11/29/201211/30/201211/30/2012 10:16:29 AMAPASS
Permit finaled. Underground flush passed as well. The outside alarm bell is ok t obe silenced by the fire/burg. panel since the internal smoke alarms do have sounder bases.
FIR12-00638 INSP-Sprinkler Rough-in11/29/201211/30/201211/30/2012 9:38:08 AMAPART
The sprinkler piping can not be covered due to the tenting not being adequate in many locations. However the underground supply piping can now be buried.