Inspections for the day of: Monday, November 30, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE11-01478 ELE-Aging Inspection11/30/201511/30/201512/2/2015 6:06:24 AM CANC
too busy
ELE15-01016 Final11/30/201511/30/201511/30/2015 2:59:23 PMPPASS
Call 15 before to meet // Steve Phone #: ###-#### ok final
ELE15-02568 Final11/29/201511/30/201511/30/2015 2:54:14 PMPPASS
Residential Final, Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta ok final
ELE15-03841 Final11/30/201511/30/201511/30/2015 2:38:48 PMPFAIL
We need final for this permit. Thank you, Dale Phone #: ###-#### Inspection requested via web by Thomas Jenkins called, no address posted for # 9, no bonding bar per 250.94, no panel cover, will fix and recall
ELE15-03692 Electrical Rough-In11/30/201511/30/201511/30/2015 1:54:53 PMPPASS
Jay Phone #: ###-#### addition ri ok on north side
ELE15-03817 Rough-In Permanent Service11/30/201511/30/201511/30/2015 12:50:39 PMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk ri ok, p/s u/g n ok
ELE15-03834 Final11/25/201511/30/201511/30/2015 11:56:07 AMPPASS
12 solar panels.
AC micro-inverter system. No DC voltage.
Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed.
Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs.
And 280 watt SolarWorld panels, ETL listed.

A single home run, in metal conduit, is ran from the array to the knife switch, located next to meter base. From the knife switch to the breaker in the meter main. The solar breaker and knife switch are permanently marked for solar with weather proof labels, and the circuit numbers identified in the knife switch and on the panel schedule.

The inverters, panels and rails are all bonded with a number 6 ground that runs down to the service electrode that can be seen under the meter main.

The meter main where the solar breaker is located is exterior, so no inside access needed for this one.


Thanks guys,
Ryan King
Phone #: ###-#### Inspection requested via web by Ryan King ok final
ELE15-03835 Final11/29/201511/30/201511/30/2015 9:43:46 AMAPASS
Please call ###-#### one half hour ahead for access. Phone #: ###-#### Inspection requested via web by Lars Johnson ok final
ELE15-02799 Final11/25/201511/30/201511/30/2015 8:19:51 AMAPASS
Phone #: ###-#### Inspection requested via web by William Salts corrections made, ok final