FIR16-00540
| INSP-Final Inspection | 11/30/2016 | 11/30/2016 | 11/30/2016 3:22:01 PM | P | PART |
|
|
A temporary for the fire sprinkler permit is ok until the new, shorter, wall PIV has been installed and tested. Supposed arrival date for the new PIV is 12-7-16
|
FIR16-00644
| INSP-Sprinkler Rough-in | 11/30/2016 | 11/30/2016 | 11/30/2016 3:20:48 PM | P | PASS |
|
|
Piping above the hardlid next to the elevator as marked on the plans is ok to cover.
|
FIR16-00364
| INSP-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 2:52:18 PM | P | CANC |
|
|
The as-build plans for this building have not been submitted and approved yet.
|
BLD16-03673
| FIRE-Final Inspection | 11/30/2016 | 11/30/2016 | 11/30/2016 2:51:46 PM | P | FAIL |
|
|
No city approved plans on site. No inspection performed.
|
BLD16-03759
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 1:31:47 PM | A | PASS |
|
|
Life safety passed. I noted a audible sync problem with the fire alarm system. As per Assistant Chief Ron this issue will need addressed prior to the next remodel.
|
FIR16-00720
| INSP-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 1:31:01 PM | A | PASS |
|
|
Permit finaled. I noted a audible sync problem. As per Assistant Chief Ron this issue will need addressed prior to the next remodel.
|
BLD16-04265
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 12:12:11 PM | A | FAIL |
|
|
Repair the emergency lights, provide double door exiting with correct hardware out of the back door as per plans or get plan review approval for single door exiting, provide annual inspection for the basement fire sprinkler system, provide three fire extinguishers upstairs and another three down stairs.
|
FIR16-00031
| INSP-Sprinkler Rough-in/Hydro | 11/29/2016 | 11/30/2016 | 11/30/2016 11:29:48 AM | P | CANC |
|
|
Mark Jensen is the contact for this inspection. He needs a rough in to cover inspection on the west system. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD16-02213
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 11:16:38 AM | A | PASS |
|
|
Life safety passed. A baffle has been provided
|
BLD16-01452
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 10:33:33 AM | A | FAIL |
|
|
Provide final inspections for the project related fire alarm and fire sprinkler permits, Provide occupant load sign and provide clearance at the FDC of 36" as discussed and as directed by the fire dept.
|
FIR16-00540
| INSP-Sprinkler Rough-in/Hydro | 11/30/2016 | 11/30/2016 | 11/30/2016 10:31:05 AM | P | PASS |
|
|
Overhead hydro test passed. Rough-in for the two new pendants passed. Piping can be covered.
|
FIR16-00651
| INSP-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 10:29:42 AM | A | FAIL |
|
|
Contact plan review to see if as-builts or plan modifications are required for the new strobe and changes in the candellas of the other strobes, provide strobe coverage in the rear exit area, provide immediate shut down of the hvac units per the IMC, provide record of completion forms.
|
BLD16-03748
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 10:25:57 AM | A | CANC |
|
|
No life safety sign off required. I contacted owner to reschedule.
Phone #: ###-#### Inspection requested via web by Shannon Wall
|
FIR16-00649
| INSP-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 8:18:46 AM | A | PASS |
|
|
permit finaled
|