Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00088 INSP-Sprinkler Rough-in11/30/201611/30/201611/30/2016 4:07:03 PMPPASS
4th floor soffit/drops ok to cover.

Except first condo which was not ready.

Discussed soffit with cabinets and to treat the cabinet face as the 'wall', width is then 10" and no under soffit sprinklers required.
FIR16-00322 INSP-Supply line flush11/29/201611/30/201611/30/2016 3:08:01 PMPDONE
supply line flush completed
FIR15-00689 INSP-Supply line flush11/29/201611/30/201611/30/2016 3:07:41 PMPDONE
Supply line flush completed.
FIR16-00534 INSP-Final Inspection11/28/201611/30/201611/30/2016 3:07:05 PMPNR
Fire alarm portion not ready. Not prepared for forward flow test.

Tested inspectors test/flow switch and bell function. Checked escutcheons
FIR16-00534 INSP-Sprinkler Rough-in/Hydro11/28/201611/30/201611/30/2016 2:28:09 PMPPASS
Hydrostatic test completed saitsfactory.
BLD16-02751 FIRE-Final Inspection11/29/201611/30/201611/30/2016 9:59:31 AMAPASS
Life Safety Pass.
NAF16-00064 INSP-Sprinkler Rough-in/Hydro11/29/201611/30/201611/30/2016 9:31:46 AMAPART
Rough-in for 1st and 2nd floor completed satisfactory. At time of inspection tenting completed OK.

No hydro complete. Rise still to be installed.