FIR16-00088
| INSP-Sprinkler Rough-in | 11/30/2016 | 11/30/2016 | 11/30/2016 4:07:03 PM | P | PASS |
|
|
4th floor soffit/drops ok to cover.
Except first condo which was not ready.
Discussed soffit with cabinets and to treat the cabinet face as the 'wall', width is then 10" and no under soffit sprinklers required.
|
FIR16-00322
| INSP-Supply line flush | 11/29/2016 | 11/30/2016 | 11/30/2016 3:08:01 PM | P | DONE |
|
|
supply line flush completed
|
FIR15-00689
| INSP-Supply line flush | 11/29/2016 | 11/30/2016 | 11/30/2016 3:07:41 PM | P | DONE |
|
|
Supply line flush completed.
|
FIR16-00534
| INSP-Final Inspection | 11/28/2016 | 11/30/2016 | 11/30/2016 3:07:05 PM | P | NR |
|
|
Fire alarm portion not ready. Not prepared for forward flow test.
Tested inspectors test/flow switch and bell function. Checked escutcheons
|
FIR16-00534
| INSP-Sprinkler Rough-in/Hydro | 11/28/2016 | 11/30/2016 | 11/30/2016 2:28:09 PM | P | PASS |
|
|
Hydrostatic test completed saitsfactory.
|
BLD16-02751
| FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 9:59:31 AM | A | PASS |
|
|
Life Safety Pass.
|
NAF16-00064
| INSP-Sprinkler Rough-in/Hydro | 11/29/2016 | 11/30/2016 | 11/30/2016 9:31:46 AM | A | PART |
|
|
Rough-in for 1st and 2nd floor completed satisfactory. At time of inspection tenting completed OK.
No hydro complete. Rise still to be installed.
|