Inspections for the day of: Wednesday, November 30, 2016.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00938 General Inspection11/25/201611/30/201612/2/2016 2:35:18 PMPPASS
Project in final stages. Rock retaining walls and terraces installed. Access road from Strata Via and disturbed hillside areas have now been hydroseeded. No corrections, permit open to observe revegetation progress.
ESC16-00435 General Inspection11/23/201611/30/201612/2/2016 1:15:18 PMAPEND
follow up on corrections from 11/23

trash picked up, no trackout or discharges at entrance or around perimeter. No new silt fence installation yet...
ESC15-01004 General Inspection11/30/201611/30/201612/2/2016 11:08:46 AM PASS
ESC13-00193 General Inspection11/30/201611/30/201612/2/2016 8:05:10 AM CANC
ESC15-01210 General Inspection11/30/201611/30/201612/1/2016 11:56:55 AM PASS
No recent activity. BMPs installed in good condition. Grass shoots growing disturbed slopes, tacifier crust still visible. SFHs to start soon,
ESC15-00862 General Inspection11/30/201611/30/201612/1/2016 11:46:15 AM CANC
revegetation phase. BLD finaled. No inspection conducted
ESC16-00935 General Inspection11/15/201611/30/201612/1/2016 11:45:48 AMPPASS
WIP on foundation excavation for adjacent hillside lots. Silt fence and security/ debris catchment fence installed below work area.
ESC16-00936 General Inspection11/15/201611/30/201612/1/2016 11:45:20 AMPPASS
WIP on foundation excavation for adjacent hillside lots. Silt fence and security/ debris catchment fence installed below work area.
ESC15-01138 General Inspection11/30/201611/30/201612/1/2016 11:11:18 AM CANC
ESC16-00670 Aging Inspection11/30/201611/30/201612/1/2016 11:07:09 AM PASS
WIP, no corrections needed.
ESC15-00556 General Inspection11/30/201611/30/201611/30/2016 3:46:37 PM CANC
ESC16-00146 Aging Inspection11/30/201611/30/201611/30/2016 3:46:18 PM CANC
ESC16-00220 Aging Inspection11/30/201611/30/201611/30/2016 3:46:08 PM CANC
ESC16-00266 Aging Inspection11/30/201611/30/201611/30/2016 3:45:58 PM CANC
ESC15-01224 General Inspection11/30/201611/30/201611/30/2016 3:42:02 PM PASS
ESC15-00541 General Inspection11/30/201611/30/201611/30/2016 1:58:45 PM PASS
ESC16-00276 General Inspection11/23/201611/30/201611/30/2016 1:19:52 PMAPASS
Subdivsion work complete and parcels ready for SFH construction. No SFH construction yet and lots are not permanently stabilized.

Notified by RP that insepction frequency will be decreased due to no activity, winter, and temporary stabilization of disturbed areas.

New subdivision storm drains have sediment filter mats installed, landscaping is common areas is complete, and graded areas have low runoff potential. No corrections needed at site.
ESC16-01427 Site Preparation11/29/201611/30/201611/30/2016 1:10:26 PMAPASS
Matt Phone #: ###-####

Residentail addition. Gravel access drive to backyard will be used for construction access and material staging. Permit sign posted. Reviewed ESC conditions with Matt. Approved. for construction. Low risk project.
ESC16-01006 General Inspection11/30/201611/30/201611/30/2016 12:16:07 PMPPASS
WIP on subdivsion lansdcaping and subdivision fencing. Roads, sidewalks, curb and gutter w/ infrastructure now complete. NO trackout or discharges coming from site construction area. Some trackout from landscaping within new roads will need sweeping after landscaping
ESC04-01008 DOC - Permit Finaled11/30/201611/30/201611/30/2016 12:11:12 PMPPASS
old expired permit removed from database
ESC03-00997 DOC - Permit Finaled11/30/201611/30/201611/30/2016 12:11:01 PMPPASS
old expired permit removed from database
ESC03-00503 DOC - Permit Finaled11/30/201611/30/201611/30/2016 12:10:53 PMPPASS
old expired permit removed from database
ESC04-00195 DOC - Permit Finaled11/30/201611/30/201611/30/2016 12:10:27 PMPPASS
old expired permit, no inspection
ESC15-00957 General Inspection11/30/201611/30/201611/30/2016 12:05:45 PM PASS
WIP on SFHs. Subdivision stormwater facilitiies installed and have sediment protection. Lots of activity, trackout and loose dirt from landscaping activity swept weekly. No trash issues, spills, or other violations observed. Lined concrete washout pit provided
ESC16-00357 Aging Inspection11/30/201611/30/201611/30/2016 8:39:35 AM PASS
Project complete, all permits finaled. ESC permit conditions satisfied.
ESC16-00357 DOC - Permit Finaled11/30/201611/30/201611/30/2016 8:38:58 AMPPASS