ELE17-03734
| Electrical Rough-In | 11/30/2017 | 11/30/2017 | 11/30/2017 2:41:35 PM | P | PASS |
|
|
We are requesting a rough-in inspection walls and ceiling for this afternoon. Our contact is Luke ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Prep room A homerun cove only rough in ok cover
|
ELE17-03878
| Conference | 11/30/2017 | 11/30/2017 | 11/30/2017 2:41:02 PM | P | DONE |
|
|
Received text from kevin at ###-#### asking if #4/0 SER is ok to use to feed 200 amp panel in garage off 200 amp meter main with 8 to 16 spaces. The 200 amp service will serve all of the load associated with entire residence as per 310.15(B)(7) so #4/0 SER OK to use. Called contact and left message.
|
ELE17-04027
| Conference | 11/30/2017 | 11/30/2017 | 11/30/2017 1:43:46 PM | P | DONE |
|
|
Call 1 hour prior to confirm Phone #: ###-#### Inspection requested via web by Steve Craig Discussed if boxes permitted above decorative drop partial ceiling. Wood panels will be small and removeable, box access ok above. Also showroom window receptacles may be few inches over 18" due to structural steel beam. OK. Asked about required emergency and egress lighting informed all depends on occupancy load and to check with life/safety inspector.
|
ELE17-00864
| Final | 11/29/2017 | 11/30/2017 | 11/30/2017 11:36:18 AM | A | PASS |
|
|
Sign electrical final. Contact Corey Welch with questions. Phone #: ###-#### Inspection requested via web by Tom Noeker Final ok
|
ELE17-02830
| Final | 11/29/2017 | 11/30/2017 | 11/30/2017 11:35:51 AM | A | PASS |
|
|
Sign electrical final. Contact Corey Welch with questions. Phone #: ###-#### Inspection requested via web by Tom Noeker Final ok
|
ELE17-00864
| Electrical Rough-In | 11/30/2017 | 11/30/2017 | 11/30/2017 11:35:37 AM | P | PASS |
|
|
Sign electrical final. Contact Corey Welch with questions. Phone #: ###-#### Inspection requested via web by Tom Noeker Listing and disconnecting means confirmed rough in ok
|
ELE17-02830
| Electrical Rough-In | 11/30/2017 | 11/30/2017 | 11/30/2017 11:34:48 AM | P | PASS |
|
|
Sign electrical final. Contact Corey Welch with questions. Phone #: ###-#### Inspection requested via web by Tom Noeker Listing and disconnecting confirmed. Rough in ok
|
ELE17-04029
| Final | 11/29/2017 | 11/30/2017 | 11/30/2017 10:57:06 AM | P | PASS |
|
|
call for access, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER Final ok
|
ELE17-04029
| Electrical Rough-In | 11/29/2017 | 11/30/2017 | 11/30/2017 10:56:35 AM | P | PASS |
|
|
call for access, ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER Misc receptacles in several offices. Rough in ok cover
|
ELE17-03112
| Final | 11/27/2017 | 11/30/2017 | 11/30/2017 10:20:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan 110.3- Devices shall be wired as per instructions. Reverse polarity GFCI in break room. 406.6- All receptacles shall have faceplates installed. Break room and IT/storage room 2 gang.
|
ELE17-03112
| Electrical Rough-In | 11/30/2017 | 11/30/2017 | 11/30/2017 10:20:14 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Grid rough in ok cover
|
ELE17-02726
| Final | 11/29/2017 | 11/30/2017 | 11/30/2017 9:34:05 AM | A | PASS |
|
|
Code 2010 Phone #: ###-#### Inspection requested via web by danny perrine Final ok
|
ELE17-03981
| Rough-In Permanent Service | 11/30/2017 | 11/30/2017 | 11/30/2017 8:34:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Rough in ok cover p/s u/g n ok
|