Inspections for the day of: Friday, November 30, 2018.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00583 INSP-Sprinkler Rough-in11/29/201811/30/201811/30/2018 2:25:32 PMPPART
Tamper switches in riser room and level 2 are now being monitored, flow switches in riser room and level 2 are monitored, both report to micron central station, system on level 2 can be made active.

Flow switch test per Tony Cetani ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
BLD16-02008 FIRE-Final Inspection11/30/201811/30/201811/30/2018 2:06:40 PMPPART
Final life fire safety inspection for Phase 5 TCO complete.

Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIR18-00875 INSP-Sprinkler Rough-in11/30/201811/30/201811/30/2018 11:48:04 AMPPASS
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete. Southwest storage room has two 155 degree heads that are less than 12 inches from heat register, corrections will need to be made to be code compliant. Also noted that there is exposed combustible material throughout the office area with no fire sprinkler protection in the interstitial space, corrections will need to be made to be code compliant, corrections will be verified at final inspection.



Mike Phone #: ###-####
BLD18-02859 FIRE-Final Inspection11/29/201811/30/201811/30/2018 10:29:15 AMAPASS
Final life fire safety inspection for racking complete, site survey by TVFP shows that sprinkler protection in areea is adequate for type of storage.

Tom Phone #: ###-####