FIR18-00583
| INSP-Sprinkler Rough-in | 11/29/2018 | 11/30/2018 | 11/30/2018 2:25:32 PM | P | PART |
|
|
Tamper switches in riser room and level 2 are now being monitored, flow switches in riser room and level 2 are monitored, both report to micron central station, system on level 2 can be made active.
Flow switch test per Tony Cetani ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD16-02008
| FIRE-Final Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 2:06:40 PM | P | PART |
|
|
Final life fire safety inspection for Phase 5 TCO complete.
Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIR18-00875
| INSP-Sprinkler Rough-in | 11/30/2018 | 11/30/2018 | 11/30/2018 11:48:04 AM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete. Southwest storage room has two 155 degree heads that are less than 12 inches from heat register, corrections will need to be made to be code compliant. Also noted that there is exposed combustible material throughout the office area with no fire sprinkler protection in the interstitial space, corrections will need to be made to be code compliant, corrections will be verified at final inspection.
Mike Phone #: ###-####
|
BLD18-02859
| FIRE-Final Inspection | 11/29/2018 | 11/30/2018 | 11/30/2018 10:29:15 AM | A | PASS |
|
|
Final life fire safety inspection for racking complete, site survey by TVFP shows that sprinkler protection in areea is adequate for type of storage.
Tom Phone #: ###-####
|