MEC96-02968
| INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | | NH |
|
|
11/01/96 350 - THE BUILDING IS LOCKED UP, COULDN'T GET IN
|
MEC96-02968
| INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | | NH |
|
|
11/01/96 350 - THE BUILDING IS LOCKED UP, COULDN'T GET IN
|
MEC96-03043
| INSP - Framing/ Rough-in | 11/1/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | A | PASS |
|
|
11/04/96 350 - R/I OK
|
MEC96-03218
| INSP - Retro Fit (check note) | 11/1/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | P | PASS |
|
|
11/04/96 350 - LATE PM GAS LINE AND LOG SET F/P OK PT OK #32822 FINAL
|
MEC96-03306
| INSP - Rough-in & Gas Pressure | 11/4/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | P | PASS |
|
|
11/04/96 350 - R/I OK PT OK #32829
|
BLD96-02089
| INSP - Framing/Rough-in | 11/4/1996 | 11/4/1996 | 11/4/1996 12:00:00 AM | P | FAIL |
|
|
11/04/96 350 - NEED LETTER FROM ENGINEER SHOWING ACCEPTANCE AND VERIFICA SHEAR WALLS, HOLD DOWN STRAPS AND NAILING OF ROOF AS ALL HAS BEEN COVERE WITHOUT INSPECTIONS. OK TO INSULATE
|