FIR04-00643
| INSP-Sprinkler Rough-in | 11/3/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | A | PART |
|
|
Underground sprinkler piping is ok to cover. Underground pipe only measures 4' from top of pipe to existing grade. Per Sam, the installer, there will be 4" of roadmix and 2" of pavement which will give it a 4'-6" bury. Top of pipe to slab is 5'-8". Will verify finish dept when road work is done. 11/4/2004 10:08:13 AM
|
FIR04-00236
| INSP-Sprinkler Rough-in/Hydro | 11/3/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | A | FAIL |
|
|
Overhead hydro test failed. 11/4/2004 12:29:26 PM
|
FIR04-00633
| INSP-Final Inspection | 11/3/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | A | FAIL |
|
|
Plans do not match installation of the piping. Resubmit plans for review and call for new inspection. 11/4/2004 9:30:07 AM
|
BLD04-00558
| FIRE-Final Inspection | 11/3/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety, fire alarm and fire sprinkler finaled 11/4/2004 4:40:47 PM
|
FIR04-00393
| INSP-Conference | 11/3/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | P | CANC |
|
|
|
FIR04-00517
| INSP-Final Inspection | 11/4/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | P | PASS |
|
|
Fire alarm finaled
|
FIR04-00463
| INSP-Final Inspection | 11/4/2004 | 11/4/2004 | 11/4/2004 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled
|