ESC05-01473
| Tracking Control | 11/2/2005 | 11/4/2005 | 11/7/2005 2:44:51 PM | A | PASS |
|
|
Top dressing has been added to construction entrance. Access control will be completed as soon as top soil is delivered.
|
ESC05-01495
| BMP Violation | 11/1/2005 | 11/4/2005 | 11/4/2005 11:02:34 AM | A | PASS |
|
|
Sign is posted, construction entrance is adequate. Will contact RP about schedule on stockpiled soils.
|
ESC04-01661
| BMP Violation | 11/2/2005 | 11/4/2005 | 11/4/2005 11:01:01 AM | A | PASS |
|
|
issues on c/n have been addressed. site looks good.
|
ESC05-01244
| Site Preparation | 11/1/2005 | 11/4/2005 | 11/4/2005 11:00:33 AM | A | PASS |
|
|
Sign has been posted. Spoke with RP about noting changes to ESC plan. Follow up, signage etc. refer to approved plan. Report to steve W. Refer to history.
|