Inspections for the day of: Tuesday, November 4, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00621 INSP-Final Inspection10/31/200811/4/200811/5/2008 10:24:29 AMAPART
Remainder of notification devices including adjustments at the 2nd floor mechanical rooms passed field testing.
FIR06-00620 INSP-Final Inspection10/31/200811/4/200811/5/2008 10:23:00 AMAPART
Reinspection for noted corrections regarding cleanroom area fire alarm notification (see activity notes 4/29) completed acceptable.
FIR08-00364 INSP-Final Inspection11/3/200811/4/200811/5/2008 10:17:29 AMPCANC
RAFE W/PROTEX Phone #: ###-#### Internet Inspection Request from: Randy Vail
FIR08-00596 INSP-Final Inspection11/4/200811/4/200811/5/2008 10:17:10 AMPPASS
Fire sprinkler permit passed final inspection.
FIR07-01042 INSP-Sprinkler Rough-in/Hydro11/3/200811/4/200811/4/2008 1:02:56 PMANR
See inspection comments completed 10/6/08.
FIR08-00465 FIR-Aging Inspection11/4/200811/4/200811/4/2008 12:35:40 PM DEFR
Pending site inspection request for work completed.
FIR08-00618 INSP-Final Inspection11/3/200811/4/200811/4/2008 11:53:18 AMAPASS
Items on C/N finished, fire alarm work passed field inspection, permit finaled.
FIR08-00713 INSP-Final Inspection11/3/200811/4/200811/4/2008 11:52:07 AMAPASS
Corrections verified for compliance, final alarm testing passed, permit finaled.
FIR08-00596 INSP-Sprinkler Rough-in/Hydro11/3/200811/4/200811/4/2008 11:50:40 AMAPART
OH fire sprinkler system modifications completed acceptable per the scope of work, noted one leak repaired while on site, one existing non-compliant head at the 2nd floor to be removed prior to final.
FIR07-00899 INSP-Final Inspection10/31/200811/4/200810/31/2008 11:04:52 AMACANC
Phone #: ###-#### Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry