FIR08-00647
| INSP-Sprinkler Rough-in | 11/3/2008 | 11/4/2008 | 11/4/2008 4:25:53 PM | A | PART |
|
|
Sprinkler rough-in is basically passed. As-builts are needed showing the pipe routing changes. Resubmittals are needed since tyco heads have been installed instead of the submitted Viking heads. Verification is needed that the cpvc underground piping is equal to or less restrictive than the submitted poly piping. A tenting inspection is needed prior to covering the piping with the blow-in insulation.
|
BLD08-02104
| FIRE-Final Inspection | 11/4/2008 | 11/4/2008 | 11/4/2008 4:23:15 PM | P | PASS |
|
|
Life safety passed
|
FIR08-00694
| INSP-Final Inspection | 11/4/2008 | 11/4/2008 | 11/4/2008 4:22:00 PM | P | PASS |
|
|
Permit finaled
|
FIR07-00874
| INSP-Sprinkler Rough-in | 11/3/2008 | 11/4/2008 | 11/4/2008 1:39:47 PM | A | PART |
|
|
The above ground hydro test for the new dining room passed and the piping can be covered.
|
BLD08-02301
| FIRE-Final Inspection | 11/3/2008 | 11/4/2008 | 11/4/2008 12:07:37 PM | A | PART |
|
|
A temporary occupancy was given until automatic flush bolts are provided for the inactive leaf on the main exit.
|