BLD10-01205
| FIRE-Conference | 11/4/2010 | 11/4/2010 | 11/5/2010 5:39:28 PM | P | DONE |
|
|
Regarding fire alarm system modifications at the remodel area.
|
FIR10-00168
| INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/5/2010 5:38:42 PM | P | PASS |
|
|
Fire alarm permit final okay. Wire shield to be provided at exposed locations below 7' AFF.
|
FIR04-00673
| INSP-Conference | 11/4/2010 | 11/4/2010 | 11/5/2010 5:35:25 PM | P | DONE |
|
|
Regarding final inspection 11/5/10. Permit finaled, scope of work finished.
|
FIR10-00502
| INSP-Supply line flush | 11/4/2010 | 11/4/2010 | 11/5/2010 5:34:09 PM | P | PART |
|
|
Underground fire supply line flush completed satisfactory.
|
FIR10-00499
| INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/5/2010 5:33:10 PM | P | PASS |
|
|
Scope of fire sprinkler work completed satisfactory, permit final approved.
|
FIR10-00158
| INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/5/2010 3:36:58 PM | P | PASS |
|
|
Noted correction item field verified, fire alarm permit okayed for final status.
|
FIR03-00029
| INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/4/2010 2:21:53 PM | A | PASS |
|
|
Permit finaled.
|
FIR10-00358
| INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/4/2010 2:19:21 PM | A | PART |
|
|
New control valve on order per contractor.
|
FIR10-00355
| INSP-Sprinkler Rough-in/Hydro | 11/4/2010 | 11/4/2010 | 11/4/2010 2:17:44 PM | A | PART |
|
|
Dry system hydro passed.
|
BLD10-02438
| FIRE-Final Inspection | 11/3/2010 | 11/4/2010 | 11/4/2010 11:45:46 AM | A | PASS |
|
|
Fire life safety inspection passed.
|