FIR13-00602
| INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 3:47:53 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00342
| INSP-Supply line flush | 11/1/2013 | 11/4/2013 | 11/4/2013 3:25:07 PM | P | CANC |
|
|
Rescheduled for tomorrow morning.
|
BLD13-01319
| FIRE-Final Inspection | 11/1/2013 | 11/4/2013 | 11/4/2013 3:24:20 PM | P | CANC |
|
|
Waiting for the project related fire alarm and fire sprinkler permits to be addressed first.
|
FIR13-00363
| INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 3:20:55 PM | P | PASS |
|
|
permit finaled
|
FIR13-00584
| INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 3:20:11 PM | P | FAIL |
|
|
Need as-built drawings showing the interconnection of the door mags into the facp and functional testing. All other items passed.
|
FIR13-00571
| INSP-Sprinkler Rough-in | 11/1/2013 | 11/4/2013 | 11/4/2013 3:17:35 PM | P | CANC |
|
|
Per Anthony work is not done yet. Rescheduled for tomorrow Phone #: ###-####
|
FIR13-00379
| INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 2:55:02 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00362
| INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 2:54:13 PM | P | PASS |
|
|
Permit finaled
|
BLD13-00440
| FIRE-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 2:52:20 PM | P | PART |
|
|
A temporary occupancy is given with Scott Arellano's permission for a max of 10 days. Items needing correct are the fire doors do not have activation per NFPA 80 (links on both sides), access controled egress doors do not have sensors or connection to the fire alarm system per IFC 1008.1.4.4, exit discharge lights need to be installed, add exit sign/emergency light in corridor, install tile in office, contact fire dept for gate at west side of building that is only 14'-6" wide.
|
FIR13-00343
| INSP-Final Inspection | 11/1/2013 | 11/4/2013 | 11/4/2013 10:51:22 AM | P | CANC |
|
|
James Raff is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR13-00602
| INSP-Sprinkler Rough-in | 11/1/2013 | 11/4/2013 | 11/4/2013 10:34:10 AM | A | PASS |
|
|
Rough-in passed
|
BLD13-01606
| FIRE-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 10:33:41 AM | P | PASS |
|
|
life safety passed
|
BLD13-01681
| FIRE-Final Inspection | 11/1/2013 | 11/4/2013 | 11/4/2013 10:33:11 AM | A | PASS |
|
|
Life safety passed
|