Inspections for the day of: Monday, November 4, 2013.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01100 General Inspection11/4/201311/4/201311/4/2013 12:14:32 PM PASS
WIP. Permit and BMPs in place. Approved.
ESC13-00371 General Inspection11/4/201311/4/201311/4/2013 12:01:54 PM PASS
Finaled. See notes.
ESC13-00371 DOC - Permit Finaled11/4/201311/4/201311/4/2013 12:01:25 PMPPASS
Lucky Fins is open for business. Permits have been finaled. All exterior work and patio structure complete. ESC conditions have been met.
ESC12-00206 Aging Inspection11/4/201311/4/201311/4/2013 11:40:43 AM PASS
Habitat for Humanity subdivision project has remaining vacants lots to be developed. MS4 DI protection and wattles on disturbed areas are installed and in good condition. No track out ; no corrections at this time.
ESC13-00540 General Inspection11/4/201311/4/201311/4/2013 11:06:42 AM PASS
Finaled. See activity notes.
ESC13-00540 DOC - Permit Finaled11/4/201311/4/201311/4/2013 11:06:13 AMPPASS
Curbing and landscaping is complete. No construction materials left on site. ESC conditions have been met, no further inspections required.
ESC13-00482 BMP Violation11/1/201311/4/201311/4/2013 10:41:40 AMAPASS
Corrections have been made:

1. Street sweeping completed Saturday
2. All MS4 drop inlets have new filter bags.
3. Construction entrances on Smokeranch have been refilled with fresh rock.
4. Perimeter access fencing repaired to prevent track out from unauthorized entrances.

Street still has some minimal track out, but is much improved. Informed RP Mike we will continue to closely monitor project.
ESC13-00481 General Inspection11/4/201311/4/201311/4/2013 10:37:10 AM PASS
BMPs have been maintained in response to correction order on other Union Square project. Construction entrances have been reparied, perimeter access fencing installed to restrict unauthorized entrance/track out. New DI bags placed on all inlets.
ESC13-00367 General Inspection11/4/201311/4/201311/4/2013 10:24:00 AM PASS
Interior work is ongoing. No ESC violations observed.
ESC13-00358 General Inspection11/4/201311/4/201311/4/2013 9:59:37 AM PASS
WIP. No trackout. Parking lot stromwater structures have DI protection. No corrections at this time.
ESC12-00797 Aging Inspection11/4/201311/4/201311/4/2013 9:32:42 AM PASS
Finaled. See activity notes.
ESC12-00797 DOC - Permit Finaled11/4/201311/4/201311/4/2013 9:32:21 AMPPASS
House is complete, landscaped and occupied. No ESC corrections required. BLD permit has already been finaled.
ESC13-00942 Site Preparation11/1/201311/4/201311/4/2013 9:15:52 AMACANC
dave Phone #: ###-####

Infill site. Washout provided. Paved construction access. No corrections required. Site prep is approved.
ESC12-00912 General Inspection11/4/201311/4/201311/4/2013 8:37:25 AM PASS