FIR15-00756
| INSP-Sprinkler Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 1:45:04 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
BLD15-02021
| FIRE-Final Inspection | 11/3/2015 | 11/4/2015 | 11/4/2015 8:45:59 AM | A | PASS |
|
|
Life safety passed
|
BLD15-01207
| FIRE-Final Inspection | 11/3/2015 | 11/4/2015 | 11/4/2015 8:31:11 AM | A | PASS |
|
|
life safety passed
|
BLD05-01282
| FIRE-Conference | 10/28/2015 | 11/4/2015 | | A | |
|
|
follow up
|