BLD15-02169
| BLD-Framing/Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 3:18:12 PM | P | FAIL |
|
|
Call when on your way to meet // Josh Phone #: ###-####. Complete lateralbracing on T12 trusses, nail off 2ply T22 and T25 trusses per the engineering. The 6x6 post by the furnance requires full bearing to the foundation system.
|
BLD13-03411
| BLD-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 3:00:29 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD13-03411
| DOC - Permit Finaled | 11/4/2015 | 11/4/2015 | 11/4/2015 3:00:19 PM | P | PASS |
|
|
|
BLD15-01207
| BLD-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 2:59:52 PM | P | PASS |
|
|
jerry Phone #: ###-####
|
BLD15-01207
| DOC - Permit Finaled | 11/4/2015 | 11/4/2015 | 11/4/2015 2:59:32 PM | P | PASS |
|
|
|
BLD15-03752
| BLD-Conference | 11/4/2015 | 11/4/2015 | 11/4/2015 2:59:13 PM | P | DONE |
|
|
John-existing bath Phone #: ###-####
|
BLD15-02106
| BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 2:59:01 PM | P | PASS |
|
|
Please call 30 -1hr ahead for access - Tony Phone #: ###-####
|
BLD15-02106
| DOC - Permit Finaled | 11/4/2015 | 11/4/2015 | 11/4/2015 2:58:52 PM | P | PASS |
|
|
|
BLD15-03640
| BLD-Foundation | 11/4/2015 | 11/4/2015 | 11/4/2015 2:58:43 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD15-03639
| BLD-Foundation | 11/4/2015 | 11/4/2015 | 11/4/2015 2:58:31 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD15-02021
| BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 2:50:26 PM | P | NR |
|
|
Pat Phone #: ###-####. Moved to am.
|
BLD15-04049
| BLD-Conference | 11/4/2015 | 11/4/2015 | 11/4/2015 11:44:42 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by mark bedard
|
BLD14-02173
| BLD-Framing/Rough-in | 11/3/2015 | 11/4/2015 | 11/4/2015 11:44:39 AM | A | CANC |
|
|
John Phone #: ###-####. Soffit framing at annex building ok.
|
BLD12-01330
| BLD-Framing/Rough-in | 11/3/2015 | 11/4/2015 | 11/4/2015 10:49:00 AM | A | CANC |
|
|
Neal Phone #: ###-####
|
BLD15-00830
| BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 10:47:57 AM | A | FAIL |
|
|
Bruce Phone #: ###-####. Remove deadbolt from 2nd. story exit, handrails are required on exterior ramp.
|
GCB15-00063
| GCB-Framing | 11/3/2015 | 11/4/2015 | 11/4/2015 9:53:38 AM | A | PART |
|
|
John ###-####. Work in progress on structural steel welding. Pending special inspection approval prior to cover.
|
GCB15-00124
| GCB-Energy | 11/3/2015 | 11/4/2015 | 11/4/2015 9:21:28 AM | A | PART |
|
|
Grey ###-####. Rigid insulation on interior side of stemwall under slab on grade has been installed and already backfilled. cannot verify depth at this time.
|
GCB15-00080
| GCB-Fire Wall | 11/3/2015 | 11/4/2015 | 11/4/2015 9:11:19 AM | A | PASS |
|
|
Larry ###-####. North parapet wall and top plate penetrations ok.
|