Inspections for the day of: Wednesday, November 4, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03932 FIRE-Final Inspection11/4/201511/4/201511/4/2015 2:35:25 PMPCANC
Spoke to point of contact. Rusty phone number ###-####, exit lights/emergency egress lighting is not ready for inspection. This inspection is cancelled per conversation with Rusty and Rusty will reshedule when repairs are complete
FIR15-00768 INSP-Final Inspection11/3/201511/4/201511/4/2015 1:23:43 PMPPASS
Final communicator inspection passed/complete.
BLD15-03788 FIRE-Final Inspection11/3/201511/4/201511/4/2015 12:55:14 PMPPASS
Fire sprinklers complete, no fire alarm work for this project, life fire safety passed/complete
FIR15-00772 INSP-Final Inspection11/4/201511/4/201511/4/2015 12:54:23 PMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00772 INSP-Sprinkler Rough-in11/4/201511/4/201511/4/2015 12:52:39 PMPPASS
Rough to cover inspection passed/complete, approved for cover.
FIR14-00912 INSP-Final Inspection11/4/201511/4/201511/4/2015 10:48:15 AMPFAIL
Contractor/Tenant is looking for a partial final for exterior of building in regards to the fire sprinkler system, wire conduit connections going to PIV tamper switch are not weather proof fittings, contractor installed flex conduit to hard pipe and used electrical tape for connection, not a weather tight fitting. Fire sprinkler systems are isolated at backlow, no active fire sprinkler systems at time of inspection. Backflow needs a current backlow inspection/tag for fire system. Wet system fire sprinkler pipng on the west side of building, patio area has heat tape installed and monitored but no piping insulation is installed, need to have insulation installed before sprinkler system is put into service/covered. Escutcheon's missing on first floor dry fire sprinkler heads, escutcheon's need to installed before next partial final inspection.
FIR15-00750 INSP-Sprinkler Rough-in11/3/201511/4/201511/4/2015 8:42:51 AMAPASS
Rough to cover inspection passed/complete, tenant space approved for cover