ESC12-00130
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 4:21:26 PM | | PEND |
|
|
|
ESC15-00544
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 3:52:07 PM | | PASS |
|
|
WiP on Union Square retail building. Silt fence sediment control installed along Overland, parking lot/access drive is not asphalt so no trackout issues. DI bags on Cable Car have inlet protection. No spills or discharges observed around site, trash and materials are contained. No corrections requested at this time. Approved.
|
ESC15-00545
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 3:51:54 PM | | PASS |
|
|
WiP on Union Square retail building. Silt fence sediment control installed along Overland, parking lot/access drive is not asphalt so no trackout issues. DI bags on Cable Car have inlet protection. No spills or discharges observed around site, trash and materials are contained. No corrections requested at this time. Approved.
|
ESC13-00230
| Site Final | 11/4/2015 | 11/4/2015 | 11/4/2015 3:10:14 PM | P | CANC |
|
|
data entry error
|
ESC15-00720
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 3:07:57 PM | P | PASS |
|
|
WIP on temple frame. No trackout or discharges from site. Trash and materials contained, no fugitive dust or wind blown litter observed. DI bags installed on Ardene. Approved.
|
ESC15-00499
| General Inspection | 11/3/2015 | 11/4/2015 | 11/4/2015 3:02:52 PM | P | PASS |
|
|
Del Taco near completion. Site is not yet landscaped. Rear lot still has stockpile, but there is no trackout occuring, no sediment runoff, or other violations occuring. Permit sign posted on fence on Overland. Materials and waste are contained and site well kept. No corrections.
|
ESC15-01473
| Site Preparation | 11/4/2015 | 11/4/2015 | 11/4/2015 2:43:52 PM | P | PASS |
|
|
David// please call before Phone #: ###-####
Homeowner RP/GC. Flat lot, work to occur within backyard. Existing driveway will be used for loading/unloading of materials. Reviewed ESC permit conditions; permit sign posted in window.
Approved for construction - plan is to start tomorrow.
|
ESC15-00023
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 1:21:53 PM | | PASS |
|
|
|
ESC15-01350
| Site Preparation | 11/4/2015 | 11/4/2015 | 11/4/2015 1:00:14 PM | P | PASS |
|
|
clint Phone #: ###-####
Approved for construction,scheduled to begin tomorrow or Friday. Permit signs posted, additional BMPs in process of being installed including:
-DI bags x2 on alley behind construction - lined concrete washout (first 3 homes used washout in DHE #12) - permiter wattle along the south edge/sidewalk - silt fence/construction fencing to control trackout and access to lots from alley. Allowed to be untrenched as it is intended as an administrative control rather than sediment control.
Approved. Tahoe Homes projects currently in compliance.
|
ESC15-01348
| Site Preparation | 11/4/2015 | 11/4/2015 | 11/4/2015 12:59:58 PM | P | PASS |
|
|
clint Phone #: ###-####
Approved for construction,scheduled to begin tomorrow or Friday. Permit signs posted, additional BMPs in process of being installed including:
-DI bags x2 on alley behind construction - lined concrete washout (first 3 homes used washout in DHE #12) - permiter wattle along the south edge/sidewalk - silt fence/construction fencing to control trackout and access to lots from alley. Allowed to be untrenched as it is intended as an administrative control rather than sediment control.
Approved. Tahoe Homes projects currently in compliance.
|
ESC15-01344
| Site Preparation | 11/4/2015 | 11/4/2015 | 11/4/2015 12:59:39 PM | P | PASS |
|
|
clint Phone #: ###-####
Approved for construction,scheduled to begin tomorrow or Friday. Permit signs posted, additional BMPs in process of being installed including:
-DI bags x2 on alley behind construction - lined concrete washout (first 3 homes used washout in DHE #12) - permiter wattle along the south edge/sidewalk - silt fence/construction fencing to control trackout and access to lots from alley. Allowed to be untrenched as it is intended as an administrative control rather than sediment control.
Approved. Tahoe Homes projects currently in compliance.
|
ESC15-01342
| Site Preparation | 11/4/2015 | 11/4/2015 | 11/4/2015 12:59:22 PM | P | PASS |
|
|
clint Phone #: ###-####
Approved for construction,scheduled to begin tomorrow or Friday. Permit signs posted, additional BMPs in process of being installed including:
-DI bags x2 on alley behind construction - lined concrete washout (first 3 homes used washout in DHE #12) - permiter wattle along the south edge/sidewalk - silt fence/construction fencing to control trackout and access to lots from alley. Allowed to be untrenched as it is intended as an administrative control rather than sediment control.
Approved. Tahoe Homes projects currently in compliance.
|
ESC14-00597
| Aging Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 10:49:02 AM | | PASS |
|
|
WIP at the District. See main ESC permit ESC14-00588 for inspection details.
|
ESC14-00596
| Aging Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 10:48:47 AM | | PASS |
|
|
WIP at the District. See main ESC permit ESC14-00588 for inspection details.
|
ESC14-00595
| Aging Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 10:48:34 AM | | PASS |
|
|
WIP at the District. See main ESC permit ESC14-00588 for inspection details.
|
ESC14-00594
| Aging Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 10:48:13 AM | | PASS |
|
|
WIP at the District. See main ESC permit ESC14-00588 for inspection details.
|
ESC14-00588
| General Inspection | 11/3/2015 | 11/4/2015 | 11/4/2015 10:47:08 AM | A | PASS |
|
|
930-10 AM discuss BMPs for newly installed swales
New sand window swales have been installed between sidewalk and Parkcenter Blvd. The inlet are curb cuts with shall basins and concrete downspouts into swale . To protect swales, sand/rock bags will filter water through the spout.
Parkcenter roadway improvements are to be completed today, roadway will be swept and all 3 lanes will be opened. Entrance to the District is now paved, RP stated a new rock construction entrance will be installed behind paved portion to control trackout from material trucks and employee parking.
Former irrigation collection pond has now been filled in and buildings are in progress in the area. Stormwater that has drained into irrigation ditch/box is being pumped over to old groundwater discharge treatment area. Very low flow, no turbidity observable in Loggers Creek. Silt fence perimeter protecting the waterway is in good condition and no breaks found.
Lined concrete washoul box located in center of project with signage is in use and no significant leaks or failures. Trash management is acceptable, no windblown litter or material wrappings.
No corrections at this time. Site will be in good condition after final sweeping this afternoon on Parkcenter.
|
ESC14-00989
| General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 9:24:01 AM | | PASS |
|
|
WIP. Structural perimeter and curbing containing sediment on site. No trackout or other issues. Approved.
|
ESC15-00976
| General Inspection | 11/3/2015 | 11/4/2015 | 11/3/2015 2:51:16 PM | A | CANC |
|
|
data entry error
|