Inspections for the day of: Friday, November 4, 2016.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-03316 Final11/3/201611/4/201611/4/2016 2:12:01 PMAFAIL
Partial Final with a few exclusions Men and Women Locker Rooms Phone #: ###-#### Inspection requested via web by Tom Betty
Due to the condition of electrical equipment and wiring installed for elevators I felt life safety issues present. The City of Boise does not have jurisiction over elevator installations however I have informed Daryl DeGrange Chief Electrical Inspector of issues and he will call head of state to inform of condition. When he informs me how to proceed I will make appropriate calls.
Receptacle outlet buried behind plywood in maintenance office, electrical rooms and disconnect area work space shall not be used as storage, box in rm 115A needed on wiring, ele rm G114 door would not open, fire pumps in off position due to leak, misc receptacles not working B1A-3, B1C-9, B1A-1315 17, damaged receptacle covers B1B-13, N.E.corner of garage.
Not holding temp occupancy for parking garage for misc items just elevator rooms.
ELE16-02757 Final11/4/201611/4/201611/4/2016 12:18:59 PMAPASS
For access call John 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott
Access panels required for 2 receptacle outlets located behind rock wall. At time of final studs in place for rock climbing wall. Permits in place for solar future installation. Final ok
ELE16-02840 Final11/4/201611/4/201611/4/2016 11:45:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk
Final ok