ELE98-03870
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/6/1998 12:00:00 AM | A | PASS |
|
|
11/06/98 315 - JOHN- ###-#### TEMP POLE-OVERHEAD-BACK OF LOT BY ALLEY ok done 11/05/98 (PM)
|
ELE98-03659
| INSP - Final | 11/5/1998 | 11/5/1998 | 11/6/1998 12:00:00 AM | P | PASS |
|
|
11/06/98 315 - TEMP POLE--SHANE ###-#### done 11/05/98 (PM)
|
ELE98-02538
| INSP - Electrical Rough-In | 11/5/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | | PART |
|
|
/ / 315 - r/i and corrections posted 410-16 (a) independent support fo 50 lb, and 300-5 shall maintain 24 inches of depth for conduit in parkin
|
ELE98-03875
| INSP - Electrical Rough-In | 11/5/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | | PASS |
|
|
/ / 315 - 18rms 1a/c 200a
|
ELE98-03875
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | A | CANC |
|
|
11/04/98 315 - emmet ###-#### r/i & perm serv see added r/i inspection request
|
ELE98-02670
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | A | PASS |
|
|
11/04/98 315 - DOOR OPEN--BILL ###-#### ok
|
ELE98-03160
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | A | PASS |
|
|
11/04/98 315 - DOOR OPEN--DAWN ###-#### ok
|
ELE98-03734
| INSP - Electrical Rough-In | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | A | PART |
|
|
11/04/98 315 - U/G SLAB R/I--CURT ###-#### BLIMPIE'S ok
|
ELE98-03895
| INSP - Electrical Rough-In | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | A | PASS |
|
|
11/05/98 315 - ###-#### R/I SERVICE 12rms 1a/c 200a
|
ELE98-03907
| INSP - Electrical Rough-In | 11/5/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | P | PART |
|
|
11/05/98 315 - SARA- ###-#### R/I INSP 10rms 1a/c 200a
|
ELE98-03885
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | P | PASS |
|
|
11/05/98 315 - ROWDY ###-#### p/s anf r/i ok 1 circuit extension 220a rec.
|
ELE98-03890
| INSP - Final | 11/4/1998 | 11/5/1998 | 11/5/1998 12:00:00 AM | P | FAIL |
|
|
11/05/98 315 - PERM SERV--ALAN ###-#### cor. posted 250-81 grd to water 1st 5 ft 310-12 no ID #6 or smaller, 110 needs approved connection a/c grd in j box
|