PLM01-02989
| PLM-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | | PASS |
|
|
appears to be done 11/5/2001 9:54:43 AM
|
PLM01-02809
| PLM-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | | PART |
|
|
60 more 11/5/2001 2:21:39 PM
|
PLM01-02810
| PLM-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | | PART |
|
|
60 more 11/5/2001 2:21:52 PM
|
PLM01-02644
| PLM-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | | PART |
|
|
no call yet 11/5/2001 2:24:32 PM
|
PLM01-03767
| Water and/or Sewer | 11/2/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | A | PART |
|
|
###-#### BOB WATER ONLY ; need to add backflow valve and I called Bob and told him to call it back in when he got it tested.
|
PLM01-03240
| Groundwork | 11/2/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 15:15:56. Contact: ###-####.FIRE PUMP ROOM ; ok 11/5/2001 2:03:44 PM
|
PLM01-03761
| Water and/or Sewer | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 309 On 11/5/2001 11:48:47 AM
|
PLM01-03761
| Water and/or Sewer | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 11/5/2001 11:51:32 AM
|
PLM01-03752
| Groundwork | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | P | PASS |
|
|
rick ###-#### 3 underground (in slab) polyproplene main drains for equipment condensate from above. Noted that direct placement in concrete. Contractor said he questioned that with the engineers and they said they were comfortable with it. 11/5/2001 1:27:19 PM
|
PLM01-03772
| Sprinkler (Final) | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | P | PASS |
|
|
###-#### doug
|
PLM01-03773
| Sprinkler (Final) | 11/5/2001 | 11/5/2001 | 11/5/2001 12:00:00 AM | P | PASS |
|
|
doug ###-####
|