PLM03-03154
| Plumbing Rough-in | 11/4/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | A | PASS |
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
PLM03-03472
| Water and/or Sewer | 11/4/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | A | CANC |
|
|
###-#### Larry
|
PLM03-02008
| Plumbing Rough-in | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | PART |
|
|
2nd floor Thank you
; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 2nd floor ok, tests ok. Have to change out san tees to double fixture fitting on second floor toilet waste. 11/5/2003 2:39:44 PM
|
PLM03-03166
| Final | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/5/2003 at 9:25:55 AM. Contact: ###-####.signed temp occ but main building backlow still not certified. 11/5/2003 4:28:38 PM
|
PLM03-02520
| Final | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | FAIL |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie small correction on prv line 11/5/2003 3:05:20 PM
|
PLM03-03057
| Final | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/5/2003 at 10:14:55 AM. Contact: ###-####. Drain pan not connected. 11/5/2003 3:35:34 PM
|
PLM03-03481
| Water and/or Sewer | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | PART |
|
|
Byion ###-#### ok to cover water line except connection , will put test on water and call back in when sewer is ready. 11/5/2003 11:05:52 AM
|
PLM03-03472
| Water and/or Sewer | 11/5/2003 | 11/5/2003 | 11/5/2003 12:00:00 AM | P | CANC |
|
|
|