BLD04-01510
| BLD-Aging Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | | DONE |
|
|
I spoke to the contractor, chris, and he was going to call the electrical contractor to get the status on the emergency lights and then call me back 11/5/2004 9:29:25 AM
|
BLD04-02254
| FIRE-Final Inspection | 11/4/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | A | FAIL |
|
|
I notified the tenant improvement contractor, Gary, that I could not give him a final on the tenant improvement since the shell pemit had never been finaled and was infact expired. After discussing this with Linda and George Slane I told him he needs to contact plan review on reinstating the permit 11/5/2004 10:25:12 AM
|
BLD02-03023
| BLD-Conference | 11/5/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | A | DONE |
|
|
I notified the tenant improvement contractor, Gary, that I could not give him a final on the tenant improvement since the shell pemit had never been finaled and was infact expired. After discussing this with Linda and George Slane I told him he needs to contact plan review on reinstating the permit
|
FIR04-00236
| INSP-Sprinkler Rough-in/Hydro | 11/5/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | P | PART |
|
|
Overhead hydro test passed. Forward flush of backflow passed. 24 hour air test started at 2:30 with 41 1/2 psi on the guage. 11/5/2004 2:41:03 PM
|
FIR04-00549
| INSP-Final Inspection | 11/3/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | P | FAIL |
|
|
Sprinkler rough-in is ok. Piping is ok to cover. Can't final until ceilings are complete at sprinkler pendants. 11/4/2004 11:26:29 AM
|
BLD04-01268
| FIRE-Final Inspection | 11/5/2004 | 11/5/2004 | 11/5/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/5/2004 at 7:37:33 AM. Contact: ###-####.
|