ESC08-00491
| Random Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 3:28:01 PM | P | PART |
|
|
George at Winco. BMP's to reduce mud trackout were discussed. Observed tire washing by Concrete truck drivers as they exited. RP needs to lengthen rock entrance. Concrete washout are being used. Overall site is in good shape.
|