Inspections for the day of: Wednesday, November 5, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01516 FIRE-Final Inspection11/5/200811/5/200811/6/2008 10:32:44 AMPFAIL
The approved lever hardware has been installed but the original thumbturn dead bolt has been replaced with a keyed deadbolt. This arrangement is not allowed due to two motions required to open the door. I contacted Sam on the status of the inspection.
BLD08-00708 FIRE-Final Inspection11/4/200811/5/200811/5/2008 3:33:09 PMPFAIL
There were no approved plans on site. No inspection was performed.
BLD06-02059 FIRE-Final Inspection11/4/200811/5/200811/5/2008 3:00:07 PMPPASS
Life safety passed.
FIR08-00563 INSP-Sprinkler Rough-in/Hydro11/4/200811/5/200811/5/2008 2:59:06 PMAPART
The sprinkler rough-in in general is ok. I need one painted head changed out and access provided above a storage room to verify upright sprinkler coverage. A separation needs to be provided between the area on the first floor where pendants were removed and uprights added and the phase two area that only has pendant protection. Also there are many locations where the second floor insulation is causing obstructions with the upright sprinkler heads.
FIR08-00595 INSP-Sprinkler Rough-in11/4/200811/5/200811/5/2008 1:25:17 PMAPASS
The east exterior canopy can be covered now that the piping type and sizing has been corrected.
FIR08-00299 INSP-Sprinkler Rough-in/Hydro11/4/200811/5/200811/5/2008 12:03:09 PMAPASS
See approved plans for areas where the sprinkler piping is ok to cover.
FIR08-00627 INSP-Supply line flush11/4/200811/5/200811/5/2008 12:02:30 PMAPASS
Underground flush passed. The water flow seemed low but there was a long run of hose. I will verify water supply during forward flush.
FIR08-00627 INSP-Sprinkler Rough-in/Hydro11/4/200811/5/200811/5/2008 12:01:30 PMAPASS
Underground hydro test passed
FIR08-00647 INSP-Sprinkler Rough-in11/4/200811/5/200811/5/2008 10:33:27 AMAPART
The underground piping can be covered. I still need verification that the installed cpvc piping is adequate as compared to the poly that was shown to be installed.