BLD08-01516
| FIRE-Final Inspection | 11/5/2008 | 11/5/2008 | 11/6/2008 10:32:44 AM | P | FAIL |
|
|
The approved lever hardware has been installed but the original thumbturn dead bolt has been replaced with a keyed deadbolt. This arrangement is not allowed due to two motions required to open the door. I contacted Sam on the status of the inspection.
|
BLD08-00708
| FIRE-Final Inspection | 11/4/2008 | 11/5/2008 | 11/5/2008 3:33:09 PM | P | FAIL |
|
|
There were no approved plans on site. No inspection was performed.
|
BLD06-02059
| FIRE-Final Inspection | 11/4/2008 | 11/5/2008 | 11/5/2008 3:00:07 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00563
| INSP-Sprinkler Rough-in/Hydro | 11/4/2008 | 11/5/2008 | 11/5/2008 2:59:06 PM | A | PART |
|
|
The sprinkler rough-in in general is ok. I need one painted head changed out and access provided above a storage room to verify upright sprinkler coverage. A separation needs to be provided between the area on the first floor where pendants were removed and uprights added and the phase two area that only has pendant protection. Also there are many locations where the second floor insulation is causing obstructions with the upright sprinkler heads.
|
FIR08-00595
| INSP-Sprinkler Rough-in | 11/4/2008 | 11/5/2008 | 11/5/2008 1:25:17 PM | A | PASS |
|
|
The east exterior canopy can be covered now that the piping type and sizing has been corrected.
|
FIR08-00299
| INSP-Sprinkler Rough-in/Hydro | 11/4/2008 | 11/5/2008 | 11/5/2008 12:03:09 PM | A | PASS |
|
|
See approved plans for areas where the sprinkler piping is ok to cover.
|
FIR08-00627
| INSP-Supply line flush | 11/4/2008 | 11/5/2008 | 11/5/2008 12:02:30 PM | A | PASS |
|
|
Underground flush passed. The water flow seemed low but there was a long run of hose. I will verify water supply during forward flush.
|
FIR08-00627
| INSP-Sprinkler Rough-in/Hydro | 11/4/2008 | 11/5/2008 | 11/5/2008 12:01:30 PM | A | PASS |
|
|
Underground hydro test passed
|
FIR08-00647
| INSP-Sprinkler Rough-in | 11/4/2008 | 11/5/2008 | 11/5/2008 10:33:27 AM | A | PART |
|
|
The underground piping can be covered. I still need verification that the installed cpvc piping is adequate as compared to the poly that was shown to be installed.
|