Inspections for the day of: Wednesday, November 5, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00359 BMP Violation11/4/200811/5/200811/6/2008 8:14:02 AMPPART
D.I.'s protected but still sediment out on roadway. Did clean it up but further tracking has occured. Will re-inspect on 11/10/08.
ESC08-00765 Tracking Control11/3/200811/5/200811/5/2008 4:17:49 PMAPASS
ESC08-00491 Tracking Control11/3/200811/5/200811/5/2008 2:46:05 PMAFAIL
Correction Notice.
Clean up all tracking off of the access area. Also figure out a acceptiable process to eliminate tracking. Amend your plan and swppp to the process of the process. Will re-inspect on 11/07/08 PM
ESC08-00464 Tracking Control11/3/200811/5/200811/5/2008 2:32:59 PMAPART
Told RP to clean up tracking on the back access and tune upthe access.
ESC08-00178 General Inspection11/5/200811/5/200811/5/2008 9:57:22 AMAPART
Need to place a tarp under all concrete shoots where it is being transfered to any and all pumps.
ESC08-00400 Site Final11/5/200811/5/200811/5/2008 9:21:57 AMAPASS
ESC08-00758 Site Preparation ESC11/5/200811/5/200811/5/2008 9:09:22 AM PASS
All work in the back of building.
ESC08-00808 Site Preparation11/5/200811/5/200811/5/2008 8:56:57 AM PASS
ESC08-00960 Site Preparation11/5/200811/5/200811/5/2008 8:53:09 AM NR
ESC08-00958 Site Preparation11/5/200811/5/200811/5/2008 8:49:36 AM PART
Need to miniumize tracking and post sign at front of lot.
ESC08-00957 Site Preparation11/5/200811/5/200811/5/2008 8:35:16 AM NR
Work has not started on the sign.