FIR09-00473
| FIR-Aging Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 4:39:16 PM | | DEFR |
|
|
Work in progress.
|
FIR09-00384
| INSP-Sprinkler Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 4:38:21 PM | P | PART |
|
|
Partial overhead cover approved as discussed.
|
BLD08-02268
| FIRE-Final Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 4:37:33 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR09-00264
| INSP-Final Inspection | 11/4/2009 | 11/5/2009 | 11/5/2009 4:37:00 PM | P | PASS |
|
|
On site functional trip testing of the new dry system completed satisfactory, water delivered to the inspectors test at 60 seconds. Final walkthrough passed, permit finaled.
|
BLD09-01427
| FIRE-Final Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 4:33:54 PM | P | NR |
|
|
Project related fire sprinkler permit work must be finaled prior to building life safety approvals.
|
FIR09-00627
| INSP-Sprinkler Rough-in/Hydro | 11/5/2009 | 11/5/2009 | 11/5/2009 4:32:57 PM | P | PART |
|
|
Okay to cover ceiling at the new medical gas closet.
|
FIR06-00726
| INSP-Final Inspection | 11/4/2009 | 11/5/2009 | 11/5/2009 4:32:05 PM | A | PASS |
|
|
Scope of fire sprinkler permit work approved for final status.
|
FIR09-00503
| INSP-Final Inspection | 11/2/2009 | 11/5/2009 | 11/5/2009 4:31:24 PM | A | PART |
|
|
Items needed for final include knox box installation, post signage at the door to the room containing the FACP, provide a lock at the circut breaker to the panel, post a map at the panel indicating locations of initiating devices and addresses/zones, one duct detector (#2) needs to be retested for unit shutdown as HVAC controls could not be initiated. See fire code review notes items # 21,22 and 23. Remainder of fire alarm work passed inspection and site testing.
|