FIR09-00408
| INSP-Sprinkler Rough-in/Hydro | 11/5/2009 | 11/5/2009 | 11/5/2009 3:37:11 PM | P | FAIL |
|
|
The end of the underground hydro was canceled by sam via phone.
|
FIR09-00600
| INSP-Sprinkler Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 2:50:07 PM | P | PASS |
|
|
The remaining underground supply piping is ok for cover.
|
BLD09-00379
| FIRE-Final Inspection | 11/4/2009 | 11/5/2009 | 11/5/2009 2:31:14 PM | P | FAIL |
|
|
See the city approved plans for the deficiancies and locations marked in red. They include providing exit discharge lights, provide panic hardware on the rear exit door, provide single action hardware on the restroom doors and provide a occupant load sign as described in the fire review comments.
|
BLD09-01951
| FIRE-Final Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 1:54:21 PM | P | FAIL |
|
|
See the city approved plans for deficiencies marked in red. They include removing all of the dead bolts from the main exit, mounting the occupant load sign at the main exit and repairing all of the non-functional exit sign/emergency lights.
|
FIR09-00291
| INSP-Sprinkler Rough-in/Hydro | 11/4/2009 | 11/5/2009 | 11/5/2009 10:32:17 AM | A | PASS |
|
|
The overhead hydro test of both wet systems passed.
|