Inspections for the day of: Friday, November 5, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00173 FIR-Aging Inspection11/5/201011/5/201011/9/2010 11:47:48 AM NR
work is in progress. See entry for 11/9/10
FIR09-00162 FIR-Aging Inspection11/5/201011/5/201011/9/2010 11:46:40 AM PASS
permit finaled
FIR10-00337 FIR-Aging Inspection11/5/201011/5/201011/8/2010 3:10:03 PM NR
I spoke to Tom with Allied and he stated that they are waiting on the owner to address a problematic valve. He will follow up and contact me.
FIR10-00542 INSP-Sprinkler Rough-in11/5/201011/5/201011/5/2010 4:09:56 PMPPART
Both of the underground supply cover inspection were called in under this permit. The installation did not match the approved plans which were not on site. I agreed to let the piping be covered under the conditions that I get to take a copy of shop drawings with "drawn" in new pipe routing and that plans are resubmitted showing the new pipe routing. Jeff agreed and I also contacted Randy. All piping was installed except for the riser stub outs for both buildings.
FIR10-00326 INSP-Final Inspection11/4/201011/5/201011/5/2010 4:00:07 PMAPASS
Permit finaled
BLD10-02033 FIRE-Final Inspection11/4/201011/5/201011/5/2010 2:30:48 PMAPASS
life safety passed
BLD10-01599 FIRE-Final Inspection11/5/201011/5/201011/5/2010 12:56:30 PMPPASS
Life safety passed
BLD10-02462 FIRE-Final Inspection11/4/201011/5/201011/5/2010 10:16:27 AMAPASS
Life safety passed. Locks have been removed.