ESC11-00599
| General Inspection | 11/5/2012 | 11/5/2012 | 11/5/2012 12:00:00 AM | | PASS |
|
|
Final landscaping in progress at time of inspection
|
ESC12-00403
| Conference | 11/5/2012 | 11/5/2012 | 11/5/2012 12:00:00 AM | A | FAIL |
|
|
Conference called onsite to review dewatering system prior to using. Inspection yielded the following corrections before dewatering may begin: 1) Plastic sheeting used to stabilized the slopes is not keyed in at the top. We discussed using sandbags in lieu of trenching on the two asphalt sides, 2) overlap is not sealed sufficiently, 3) two holes in plastic need repaired. 4) Slopes not 2:1. Discussed safety concern about steep slopes with no point of egress.
|
ESC10-00495
| Conference | 11/5/2012 | 11/5/2012 | 11/5/2012 12:00:00 AM | P | DONE |
|
|
Conference held with contractor and developer to discuss stabilization requirements. Written correction notice issued requesting a map showing active construction and the areas that are inactive to be stabilized. Due by Nov 8, 2012. Developer plans to temporarily stabilize the inactive areas with a tackifier.
|