Inspections for the day of: Tuesday, November 5, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00571 FIR-Aging Inspection11/4/201311/5/201311/5/2013 3:42:11 PMPCANC
Anthony Phone #: ###-####
FIR13-00536 INSP-Final Inspection11/5/201311/5/201311/5/2013 3:31:13 PMPFAIL
Project is not ready for a final due to missing alot of the ceiling tile. The rough-in inspection of the piping passed and the piping can be covered.
FIR13-00342 INSP-Supply line flush11/4/201311/5/201311/5/2013 1:59:57 PMAPASS
Supply line flush passed.
BLD13-02999 FIRE-Final Inspection11/4/201311/5/201311/5/2013 11:14:26 AMAFAIL
Sprinkler pendants are overspaced near the front of the store, smoke detector for the smoke evac system has been disabled, sprinkler protection is required in the walk-in cooler, fire extinguishers need annual inspection, missing ceiling tile, floor plan does not match
BLD13-02494 FIRE-Final Inspection11/4/201311/5/201311/5/2013 9:16:07 AMAPASS
life safety passed
FIR13-00549 INSP-Final Inspection11/4/201311/5/201311/5/2013 8:55:11 AMAPASS
Permit finaled
FIR13-00343 INSP-Final Inspection11/4/201311/5/201311/4/2013 10:57:32 AMPCANC
James is the contact. THanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus