ELE12-01598
| ELE-Aging Inspection | 11/5/2014 | 11/5/2014 | 11/7/2014 9:16:48 AM | | DONE |
|
|
Left message with contractor
|
ELE14-02270
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 5:03:00 PM | P | FAIL |
|
|
36 solar panels. AC micro-inverter system. No DC voltage. We used Enphase M250 micro inverters and ET Solar solar panels, both listed and approved. This is a pole mount system, mounted back behind the house. There is a single home run, in conduit, running 300 feet from the solar array to the knife switch, located next to meter base on south corner of home. From the knife switch to the 40 amp breaker in main panel, at the top, opposite the feeder lugs. The solar breaker is clearly marked with label plate, and its circuit number identified in the knife switch and the panel schedule. The inverters, panels and rails are all bonded with a number 6 ground that is bonded to one of the 6" poles that runs 8 feet deep into the ground. The equipment/circuit ground is a number 6 in the conduit that runs back to the service ground.
For access to the garage/main panel, call home owner at 208.867.8002. His name is Dwayne Peters.
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King No underground inspection performed 352.30 Securing and support of riser 250.92B.4 bond bushings at concentric knockouts 250.96 non conductive paint to be removed at ground point 240.15B circuit breakers shall open all ungrounded conductors simultaneously no supplemental ground Spoke to Jason Blais, 11-5-14, 2:30 PM, no building permit required
|
ELE14-01597
| Electrical Rough-In | 11/5/2014 | 11/5/2014 | 11/5/2014 4:24:51 PM | P | CANC |
|
|
final on several office areas ready to occupy , also rough-in to cover ceilings Shane is the contact on site ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Contractor put inspection for wrong date.
|
ELE14-03099
| Permanent Service | 11/5/2014 | 11/5/2014 | 11/5/2014 4:12:03 PM | P | PASS |
|
|
PS, OH, RC, OK
|
ELE14-03099
| Final | 11/5/2014 | 11/5/2014 | 11/5/2014 4:11:31 PM | P | FAIL |
|
|
Larry Phone #: ###-#### Spoke to contractor, no access, need to see grounding system 110.22 Each disconecting means shall be identified for its purpose 250.54 D 2 Supplemental elctrode required 312.5 B NM cable shall be bushed at openings
City code 4.5.32 Known code violations shall not be retained
|
ELE14-02512
| Final | 11/5/2014 | 11/5/2014 | 11/5/2014 3:27:29 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by steve sellers 225.32 Disconnecting means shall be located at nearest point of entrance to seperate structure 110.26A Working clearance in front of panel
|
ELE14-03004
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 1:27:44 PM | P | CANC |
|
|
jASON gAYTHWAITE IS OUR JOURNEYMAN CONTACT Phone #: ###-#### Inspection requested via web by Kelly Felin cancelled by contractor, conducted conference
|
ELE14-03004
| Conference | 11/5/2014 | 11/5/2014 | 11/5/2014 1:27:09 PM | P | DONE |
|
|
jASON gAYTHWAITE IS OUR JOURNEYMAN CONTACT Phone #: ###-#### Inspection requested via web by Kelly Felin Discuss requirements for service change
|
ELE14-01682
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 12:56:11 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean Temp occ OK, need to see HVAC systems, no access to rooftop, unsafe, and discuss water line with Daryl
|
ELE14-03004
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 11:17:14 AM | P | CANC |
|
|
jASON gAYTHWAITE IS OUR JOURNEYMAN CONTACT Phone #: ###-#### Inspection requested via web by Kelly Felin Posted two final inspections, cancelled one, Cevyn
|
ELE14-02730
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 11:13:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt
FInal OK
|
ELE14-03080
| Electrical Rough-In | 11/4/2014 | 11/5/2014 | 11/5/2014 10:42:23 AM | A | NR |
|
|
THIS IS FOR UNDERGROUND POWER INSPECTION ONLY. Underground inspection is not an option so I did rough in inspection. Trench is in residential backyard which requires 18" minimum, did not know if you needed to see it or not ###-####. AM or PM will work. Phone #: ###-#### Inspection requested via web by Cindie Swaim Not REady, conduit not installed in trench yet
|
ELE14-00437
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 10:25:02 AM | A | PASS |
|
|
FInal OK
|
ELE14-03097
| Electrical Rough-In | 11/5/2014 | 11/5/2014 | 11/5/2014 10:12:33 AM | A | PASS |
|
|
Unit should be open all day. Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman RI ok to cover. For final inspection, I will need to see permanent labeling for meter base, and panel along with panel schedule
|
ELE14-01682
| Rough-In Permanent Service | 11/4/2014 | 11/5/2014 | 11/5/2014 9:59:13 AM | A | PASS |
|
|
Please inspect the Service as we will have IPCO shut down the service in the AM for your inspection. Phone #: ###-#### Inspection requested via web by Spencer McLean PS, UG, N OK
|
ELE14-02007
| Rough-In Permanent Service | 11/5/2014 | 11/5/2014 | 11/5/2014 9:10:27 AM | A | PASS |
|
|
rough in ok to cover PS,UG,N,OK
|
ELE14-02007
| Final | 11/4/2014 | 11/5/2014 | 11/5/2014 7:05:52 AM | A | CANC |
|
|
Phone #: ###-#### Wrong inspection entered by office, CR
|
ELE14-02270
| Rough-In Permanent Service | 11/5/2014 | 11/5/2014 | 11/5/2014 7:04:25 AM | A | CANC |
|
|
wrong insp.
|
ELE14-00437
| Final | 11/3/2014 | 11/5/2014 | 11/4/2014 9:14:34 AM | A | NR |
|
|
Erin Phone #: ###-#### left message with owner, not ready
|