BLD14-02182
| BLD-Foundation | 11/5/2014 | 11/5/2014 | 11/6/2014 2:49:09 PM | P | PEND |
|
|
JR-pour time 3:00 Phone #: ###-####. Retaining wall. Rebar ok as per engineered drawings that the contractor provided. There were not aproved drawing for this the retaining walls.
|
BLD14-01146
| BLD-Conference | 11/5/2014 | 11/5/2014 | 11/5/2014 4:53:50 PM | P | DONE |
|
|
Contact Bill Phone #: ###-####
|
BLD14-02138
| BLD-Concrete | 11/4/2014 | 11/5/2014 | 11/5/2014 3:58:29 PM | P | PASS |
|
|
Slab on Grade rebar Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD14-00469
| BLD-Final | 11/3/2014 | 11/5/2014 | 11/5/2014 3:15:35 PM | P | FAIL |
|
|
Erin Phone #: ###-####. Missing corbon monoxide detector. CN posted
|
BLD14-03077
| BLD-Foundation | 11/5/2014 | 11/5/2014 | 11/5/2014 2:43:45 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD14-03045
| BLD-Footing | 11/5/2014 | 11/5/2014 | 11/5/2014 2:37:12 PM | P | CANC |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD14-03082
| BLD-Footing | 11/4/2014 | 11/5/2014 | 11/5/2014 1:14:08 PM | A | PASS |
|
|
Mike-would like late am Phone #: ###-####
|
BLD14-02341
| BLD-Energy code compliance | 11/4/2014 | 11/5/2014 | 11/5/2014 1:13:49 PM | P | PASS |
|
|
Kevin Phone #: ###-####
|
BLD14-00629
| BLD-Final | 11/4/2014 | 11/5/2014 | 11/5/2014 10:35:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Naida Khan
|
BLD14-00629
| DOC - Permit Finaled | 11/5/2014 | 11/5/2014 | 11/5/2014 10:35:27 AM | P | PASS |
|
|
|
BLD13-02759
| BLD-Energy code compliance | 11/4/2014 | 11/5/2014 | 11/5/2014 9:34:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD14-01168
| BLD-Wall Bracing | 11/4/2014 | 11/5/2014 | 11/5/2014 9:09:16 AM | A | PASS |
|
|
Chris Phone #: ###-####
|