ELE18-03585
| Electrical Rough-In | 11/5/2018 | 11/5/2018 | 11/5/2018 2:53:04 PM | P | PASS |
|
|
We need a ceiling inspection. Jeff is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker ceiling ok to cover
|
ELE18-04196
| Rough-In Permanent Service | 11/5/2018 | 11/5/2018 | 11/5/2018 2:32:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|
ELE18-02510
| Final | 11/5/2018 | 11/5/2018 | 11/5/2018 1:54:00 PM | P | PASS |
|
|
counter plug is in book shelf cabinet next to dishwasher on left side Phone #: ###-#### Inspection requested via web by kevin blackmon Correction made final ok
|
ELE18-03606
| Final | 11/5/2018 | 11/5/2018 | 11/5/2018 1:53:27 PM | P | PASS |
|
|
Ask for Regina to show you where the remodel is. Thanks, Ron Phone #: ###-#### Inspection requested via web by Ron Zimmerman Final ok
|
ELE18-04265
| Permanent Service | 11/5/2018 | 11/5/2018 | 11/5/2018 1:09:58 PM | P | NR |
|
|
CONTACT: Rob Lawrence Phone #: ###-#### Inspection requested via web by Deb Gooden Not ready. Service needs updated. No main Disc and no grounding present
|
ELE18-02750
| Final | 11/5/2018 | 11/5/2018 | 11/5/2018 11:17:19 AM | P | NR |
|
|
I''ve added two eight foot grounding rods 6 feet apart with #4 copper wire connecting them to the service meter. I have not connected the wire into the panel--leaving that for my electrician when he comes to do the cut-over with Idaho Power. I have left an ample length of #4 wire from the grounding rods to the service meter. I''ve also flipped the expansion coupler over so that it''s now correctly oriented. Please call if you have any questions ###-#### thank you, Dru Phone #: ###-#### Inspection requested via web by Dru Nakaya Spoke with contractor, He wiil schedule inspection when he is ready
|
ELE09-01975
| ELE-Aging Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 10:07:49 AM | | FAIL |
|
|
Multiple attemps made to work with contractor on final. No contact made at this time
|
ELE09-01301
| ELE-Aging Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 10:07:22 AM | | FAIL |
|
|
Multiple attemps made to work with contractor on final. No contact made at this time
|
ELE18-04178
| Final | 11/2/2018 | 11/5/2018 | 11/5/2018 9:41:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|
ELE18-04158
| Final | 11/2/2018 | 11/5/2018 | 11/5/2018 9:40:51 AM | A | PASS |
|
|
Please contact Micah at ###-#### to ensure we have an installer to meet you on site for the inspection. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
ELE18-04242
| Electrical Rough-In | 11/2/2018 | 11/5/2018 | 11/5/2018 9:39:53 AM | A | FAIL |
|
|
Shane is point of contact Phone #: ###-#### Inspection requested via web by Same Electric 210.70A2(2)Light shall be provided on all exterior exits. 210.52A2. Recep shall be within 6ft of wall breaks Note:Voicemail box was full. Unable to leave message.
|
ELE18-04253
| Rough-In Permanent Service | 11/4/2018 | 11/5/2018 | 11/5/2018 9:07:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman Rough in ok p/s u/g n ok
|
ELE18-04229
| Electrical Rough-In | 11/2/2018 | 11/5/2018 | 11/5/2018 8:39:59 AM | A | PASS |
|
|
Underground and bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Corner bond and underground to pump equipment ok
|