PLM95-01568
| INSP - Framing/ Rough-in | 11/6/1995 | 11/6/1995 | 11/6/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-01586
| INSP - Plumbing Rough-in | 11/3/1995 | 11/6/1995 | 11/6/1995 12:00:00 AM | A | PASS |
|
|
INDIRECT WASTE FOR VIGGIE SINK PLUMB IN VEGGIE PREP SINK AND INSTALL RP FOR ESPRESSO MACHINE.$780.00 finaled 11\07\95 by #347
|
PLM95-01588
| INSP - Plumbing Rough-in | 11/6/1995 | 11/6/1995 | 11/6/1995 12:00:00 AM | P | PASS |
|
|
11/06/95 347 - READY AT 3:30 ì
|
PLM95-01099
| INSP - Final | 11/6/1995 | 11/6/1995 | 11/6/1995 12:00:00 AM | P | PASS |
|
|
REINSPECTION
|
PLM95-01299
| INSP - Plumbing Rough-in | 11/6/1995 | 11/6/1995 | 11/6/1995 12:00:00 AM | P | PASS |
|
|
11/06/95 347 -
|