Inspections for the day of: Monday, November 6, 2000.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01844 BLD-Foundation11/3/200011/6/200011/6/2000 12:00:00 AMAPART
found wall- donnie ###-####
work in progress, ok w/ verbal corrections 11/6/2000 11:58:49 AM
BLD00-02726 BLD-Wall cover11/5/200011/6/200011/6/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/05/2000 at 11:32:12. Contact: ###-####.
c/n posted, beam calcs on way, ok to insulate 11/6/2000 11:11:56 AM
BLD00-02726 BLD-Wall cover11/5/200011/6/200011/6/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/05/2000 at 11:32:12. Contact: ###-####.
c/n posted, beam calcs on way, ok to insulate 11/6/2000 11:11:56 AM
BLD00-01486 BLD-Footing11/6/200011/6/200011/6/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 11/06/2000 at 07:21:54. Contact: ###-####.
BLD00-01479 BLD-Foundation11/6/200011/6/200011/6/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/06/2000 at 07:23:05. Contact: ###-####.
wip, ok w/ verbal corrections 11/6/2000 10:12:38 AM
BLD00-01481 BLD-Footing11/6/200011/6/200011/6/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 11/06/2000 at 07:24:14. Contact: ###-####.
11/6/2000 10:17:06 AM
BLD00-03254 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMAPART
LATE AM\\BASEMENT WALLS\\###-####
foundation wall, work in progress, east and south wall only, work is per plan so far. 11/6/2000 11:07:57 AM
BLD00-03254 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMAPART
LATE AM\\BASEMENT WALLS\\###-####
foundation wall, work in progress, east and south wall only, work is per plan so far. 11/6/2000 11:07:57 AM
BLD00-01180 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMAPART
Matt ###-####
exterior shear ok, verify interior later 11/6/2000 11:57:45 AM
BLD00-01824 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMAFAIL
partial\\###-####
c/n posted on ceiling furring strips. 11/6/2000 9:09:10 AM
BLD00-02253 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMAPASS
Troy ###-#### reinspection
BLD00-02253 BLD-Energy code compliance11/3/200011/6/200011/6/2000 12:00:00 AMAPASS
Troy ###-####
BLD00-02644 BLD-Framing/Rough-in11/6/200011/6/200011/6/2000 12:00:00 AMACANC
BLD00-00905 BLD-Framing/Rough-in11/3/200011/6/200011/6/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/03/2000 at 14:33:39. Contact: ###-####.
need plans onsite, trade signoffs, no inspection made 11/6/2000 3:58:08 PM
BLD00-01522 BLD-Framing/Rough-in11/6/200011/6/200011/6/2000 12:00:00 AMPPASS
fr insp-- ed-- ###-####
BLD00-01522 BLD-Energy code compliance11/6/200011/6/200011/6/2000 12:00:00 AMPPASS
ed ###-#### energy code
BLD00-01486 BLD-Footing11/6/200011/6/200011/6/2000 12:00:00 AMPNR
Scheduled by Inspector: 415 On 11/6/2000 interior pads
BLD00-01481 BLD-Footing11/6/200011/6/200011/6/2000 12:00:00 AMPNR
Scheduled by Inspector: 415 On 11/6/2000 interior pads
BLD00-02726 BLD-Energy code compliance11/6/200011/6/200011/6/2000 12:00:00 AMPPASS
###-####