BLD01-01181
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
###-#### LARRY CEILING GRID perimitor rooms ok for cover main ceilling pending ele approval as wel as approval from fire for all ceilling. 11/6/2001 9:13:19 AM
|
BLD01-01364
| BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | CANC |
|
|
###-#### JOHN
|
BLD01-01365
| BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | CANC |
|
|
###-#### JOHN
|
BLD97-00889
| BLD-Final | 11/2/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 08:36:16. Contact: ###-####. card with micron/ ele to be addressed with jim schmer. 11/6/2001 2:41:18 PM
|
BLD00-02920
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
###-#### HUGO ARCHITECTURAL FIRE fire stopping ok at 2 hr and 4 hr process piping penatrations. 11/8/2001 3:56:52 PM
|
BLD01-01181
| BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PART |
|
|
overhead inspection ###-#### ceilling ok pending others. 11/7/2001 8:18:25 AM
|
BLD01-02053
| BLD-Footing | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
###-#### DONNY ft ok 11/6/2001 3:06:36 PM
|