PLM01-00342
| Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 15:38:37. Contact: ###-####. pipe t&p drains and pan drains to approved location, complete air handler make up water piping, test all backflow preventors, temp occ ok 11/6/2001 11:57:23 AM
|
PLM01-01203
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 11/6/2001 11:59:52 AM temp occ ok
|
PLM00-02912
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 11/6/2001 11:58:10 AM set all equipment
|
PLM00-03700
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 11/6/2001 11:58:47 AM temp occ ok
|
PLM01-00177
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 11/6/2001 11:59:16 AM temp occ ok
|
PLM01-03744
| Final | 11/2/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 309 On 11/2/2001 2:47:43 PM safty eye wash final ok 11/6/2001 10:57:25 AM
|
PLM01-02678
| Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | FAIL |
|
|
###-#### BRISTOL PLUMBING locate source of the sewer gas smell and repair prior to final inspection 11/6/2001 1:29:19 PM
|
PLM01-03781
| Roof Drains | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | FAIL |
|
|
dan--###-#### roof drain tests dont hold 11/6/2001 2:12:42 PM
|
PLM01-02538
| Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 17:45:20. Contact: ###-####. final ok will call linda and update project discription 11/6/2001 2:33:42 PM
|
PLM01-01236
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PART |
|
|
###-#### XENON conference 11/6/2001 4:12:06 PM
|
PLM01-03788
| Plumbing Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-03583
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | FAIL |
|
|
###-#### JOHN needs a sprinkler permit, air gap t&p drain, prime hub drain at water heater, secure all vents by offset thru roof, remove all plumbers tape used as hangers, increase thermol expantion protection to an st-12, vents for the interceptor must not tie together, provide a cleanout on the vents, solid lids required on interceptor. 11/6/2001 3:46:19 PM
|
PLM01-03775
| Sprinkler (Final) | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | FAIL |
|
|
###-#### 160 psi poly upstream of dcva required, use worm drive clamps upstream of dcva, test dcva 11/6/2001 2:04:20 PM
|