Inspections for the day of: Tuesday, November 6, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-00342 Final11/5/200111/6/200111/6/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/05/2001 at 15:38:37. Contact: ###-####. pipe t&p drains and pan drains to approved location, complete air handler make up water piping, test all backflow preventors, temp occ ok 11/6/2001 11:57:23 AM
PLM01-01203 Final11/6/200111/6/200111/6/2001 12:00:00 AMAPART
Added by Inspector: 330 On 11/6/2001 11:59:52 AM temp occ ok
PLM00-02912 Final11/6/200111/6/200111/6/2001 12:00:00 AMAPART
Added by Inspector: 330 On 11/6/2001 11:58:10 AM set all equipment
PLM00-03700 Final11/6/200111/6/200111/6/2001 12:00:00 AMAPART
Added by Inspector: 330 On 11/6/2001 11:58:47 AM temp occ ok
PLM01-00177 Final11/6/200111/6/200111/6/2001 12:00:00 AMAPART
Added by Inspector: 330 On 11/6/2001 11:59:16 AM temp occ ok
PLM01-03744 Final11/2/200111/6/200111/6/2001 12:00:00 AMAPASS
Scheduled by Inspector: 309 On 11/2/2001 2:47:43 PM safty eye wash final ok 11/6/2001 10:57:25 AM
PLM01-02678 Final11/5/200111/6/200111/6/2001 12:00:00 AMPFAIL
###-#### BRISTOL PLUMBING locate source of the sewer gas smell and repair prior to final inspection 11/6/2001 1:29:19 PM
PLM01-03781 Roof Drains11/5/200111/6/200111/6/2001 12:00:00 AMPFAIL
dan--###-#### roof drain tests dont hold 11/6/2001 2:12:42 PM
PLM01-02538 Final11/5/200111/6/200111/6/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/05/2001 at 17:45:20. Contact: ###-####. final ok will call linda and update project discription 11/6/2001 2:33:42 PM
PLM01-01236 Final11/6/200111/6/200111/6/2001 12:00:00 AMPPART
###-#### XENON conference 11/6/2001 4:12:06 PM
PLM01-03788 Plumbing Rough-in11/6/200111/6/200111/6/2001 12:00:00 AMPPASS
###-####
PLM01-03583 Final11/6/200111/6/200111/6/2001 12:00:00 AMPFAIL
###-#### JOHN needs a sprinkler permit, air gap t&p drain, prime hub drain at water heater, secure all vents by offset thru roof, remove all plumbers tape used as hangers, increase thermol expantion protection to an st-12, vents for the interceptor must not tie together, provide a cleanout on the vents, solid lids required on interceptor. 11/6/2001 3:46:19 PM
PLM01-03775 Sprinkler (Final)11/6/200111/6/200111/6/2001 12:00:00 AMPFAIL
###-#### 160 psi poly upstream of dcva required, use worm drive clamps upstream of dcva, test dcva 11/6/2001 2:04:20 PM