Inspections for the day of: Tuesday, November 6, 2001.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01407 BLD-Aging Inspection11/6/200111/6/200111/6/2001 12:00:00 AM NR
wip 11/6/2001 6:17:33 PM
BLD01-02718 BLD-Framing/Rough-in11/5/200111/6/200111/6/2001 12:00:00 AMACANC
###-#### cell tower
BLD00-02025 BLD-Final11/5/200111/6/200111/6/2001 12:00:00 AMAPASS
###-#### call first; ok per plan modification. 11/6/2001 2:27:53 PM
BLD01-01643 BLD-Foundation11/5/200111/6/200111/6/2001 12:00:00 AMAPART
rick ###-#### ; isolated ext ftgs ok. 11/6/2001 11:47:08 AM
BLD01-02028 BLD-Framing/Rough-in11/5/200111/6/200111/6/2001 12:00:00 AMAPART
###-####...type 2 exhaust duct chase to be filled w/ insulation, consult w/ Rick J.11/6/2001 12:05:41 PM 11/6/2001 12:06:26 PM
BLD01-02088 BLD-Framing/Rough-in11/5/200111/6/200111/6/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/05/2001 at 16:56:08. Contact: ###-####...c/n, need air seal, complete gas test, rest heating ok. nail off hangers, straps, etc. 11/6/2001 11:42:44 AM
BLD01-00000 BLD-Framing/Rough-in11/5/200111/6/200111/6/2001 12:00:00 AMAFAIL
###-#### SCOTT verbal c/n: complete firestops, 1hr lid at closets & soffit areas where missed, strap brg wall top plates as need. ok to insul. 11/6/2001 4:54:09 PM
BLD01-02897 BLD-Conference11/6/200111/6/200111/6/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 11/6/2001 9:47:57 AM re roof vents...
BLD01-02088 BLD-Framing/Rough-in11/6/200111/6/200111/6/2001 12:00:00 AMPFAIL
Scheduled by Inspector: 340 On 11/6/2001 11:41:17 AM reinsp for air seal ###-#### nr, keep c/n. 11/6/2001 5:33:33 PM
BLD01-02793 BLD-Conference11/6/200111/6/200111/6/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 11/6/2001 2:47:55 PM w/ Jay re foundation...inspected by 415?
MEC01-03134 Pressure Test11/6/200111/6/200111/6/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 11/6/2001 3:20:41 PM
BLD01-01643 BLD-Framing/Rough-in11/6/200111/6/200111/6/2001 12:00:00 AMPPART
Added by Inspector: 340 On 11/6/2001 3:59:16 PM grid...add spacer bars, perimeter wires, & seismic pods at areas >144s.f. also met w/ arch onsite, will provide resubmittal for Dr. Hollingsworth space at 1st fl.
MEC01-03089 Rough-in11/6/200111/6/200111/6/2001 12:00:00 AMPPART
Added by Inspector: 340 On 11/6/2001 5:29:23 PM add comb air to enclosure, ck at final.
MEC01-03089 Pressure Test11/6/200111/6/200111/6/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 11/6/2001 5:29:50 PM
MEC01-03134 Final11/6/200111/6/200111/6/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/06/2001 at 08:51:48. Contact: ###-####.
BLD01-02739 BLD-Foundation11/6/200111/6/200111/6/2001 12:00:00 AMPCANC
FOUNDATION WALL ###-#### JAY...called in error 11/6/2001 2:46:49 PM
BLD01-02433 BLD-Framing/Rough-in11/6/200111/6/200111/6/2001 12:00:00 AMPPART
###-#### ROY verify plbg, complete rails, ok to insul. 11/6/2001 5:30:31 PM