BLD01-01407
| BLD-Aging Inspection | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | | NR |
|
|
wip 11/6/2001 6:17:33 PM
|
BLD01-02718
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | CANC |
|
|
###-#### cell tower
|
BLD00-02025
| BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PASS |
|
|
###-#### call first; ok per plan modification. 11/6/2001 2:27:53 PM
|
BLD01-01643
| BLD-Foundation | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
rick ###-#### ; isolated ext ftgs ok. 11/6/2001 11:47:08 AM
|
BLD01-02028
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PART |
|
|
###-####...type 2 exhaust duct chase to be filled w/ insulation, consult w/ Rick J.11/6/2001 12:05:41 PM 11/6/2001 12:06:26 PM
|
BLD01-02088
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 16:56:08. Contact: ###-####...c/n, need air seal, complete gas test, rest heating ok. nail off hangers, straps, etc. 11/6/2001 11:42:44 AM
|
BLD01-00000
| BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | FAIL |
|
|
###-#### SCOTT verbal c/n: complete firestops, 1hr lid at closets & soffit areas where missed, strap brg wall top plates as need. ok to insul. 11/6/2001 4:54:09 PM
|
BLD01-02897
| BLD-Conference | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 11/6/2001 9:47:57 AM re roof vents...
|
BLD01-02088
| BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 340 On 11/6/2001 11:41:17 AM reinsp for air seal ###-#### nr, keep c/n. 11/6/2001 5:33:33 PM
|
BLD01-02793
| BLD-Conference | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/6/2001 2:47:55 PM w/ Jay re foundation...inspected by 415?
|
MEC01-03134
| Pressure Test | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/6/2001 3:20:41 PM
|
BLD01-01643
| BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 11/6/2001 3:59:16 PM grid...add spacer bars, perimeter wires, & seismic pods at areas >144s.f. also met w/ arch onsite, will provide resubmittal for Dr. Hollingsworth space at 1st fl.
|
MEC01-03089
| Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 11/6/2001 5:29:23 PM add comb air to enclosure, ck at final.
|
MEC01-03089
| Pressure Test | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 11/6/2001 5:29:50 PM
|
MEC01-03134
| Final | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 08:51:48. Contact: ###-####.
|
BLD01-02739
| BLD-Foundation | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | CANC |
|
|
FOUNDATION WALL ###-#### JAY...called in error 11/6/2001 2:46:49 PM
|
BLD01-02433
| BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 12:00:00 AM | P | PART |
|
|
###-#### ROY verify plbg, complete rails, ok to insul. 11/6/2001 5:30:31 PM
|