FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 11/6/2003 | 11/6/2003 | 11/6/2003 8:42:40 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/6/2003 at 8:40:44 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 6 2003 8:42AM.
|
FIR03-00224
| INSP-Conference | 11/4/2003 | 11/6/2003 | 11/6/2003 12:00:00 AM | A | DONE |
|
|
met with steve and charlie about what is needed to finish up the four open FIR permits 11/6/2003 12:45:14 PM
|
FIR03-00594
| INSP-Sprinkler Rough-in/Hydro | 11/5/2003 | 11/6/2003 | 11/6/2003 12:00:00 AM | A | PART |
|
|
Underground supply line is ok to cover. The connection to United Waters portion of the pipe has not been made yet. 11/6/2003 3:59:13 PM
|
BLD03-00987
| BLD-Final | 11/6/2003 | 11/6/2003 | 11/6/2003 12:00:00 AM | P | PASS |
|
|
fire life safety and fire sprinklers are finaled. Racking permit still needs to be finaled. 11/6/2003 4:00:13 PM
|