FIR06-00011
| INSP-Alarm Testing | 11/6/2007 | 11/6/2007 | 11/7/2007 11:30:09 AM | P | DONE |
|
|
See mike timmermans notes for items tested
|
BLD07-00361
| FIRE-Final Inspection | 11/6/2007 | 11/6/2007 | 11/6/2007 4:36:55 PM | P | PASS |
|
|
life safety passed.
|
BLD07-02438
| FIRE-Final Inspection | 11/6/2007 | 11/6/2007 | 11/6/2007 4:34:42 PM | P | PASS |
|
|
life safety passed.
|
BLD07-00738
| FIRE-Final Inspection | 11/5/2007 | 11/6/2007 | 11/6/2007 4:33:27 PM | P | PASS |
|
|
life safety passed.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 11/6/2007 | 11/6/2007 | 11/6/2007 4:30:55 PM | P | PART |
|
|
The piping at the 5th floor connection between the north tower and the central tower is ok to cover
|
BLD07-01294
| FIRE-Final Inspection | 11/5/2007 | 11/6/2007 | 11/6/2007 1:00:19 PM | A | PASS |
|
|
life safety passed.
|
BLD07-01297
| FIRE-Final Inspection | 11/5/2007 | 11/6/2007 | 11/6/2007 12:53:12 PM | A | PASS |
|
|
life safety passed
|
BLD07-02498
| FIRE-Final Inspection | 11/6/2007 | 11/6/2007 | 11/6/2007 12:41:49 PM | P | FAIL |
|
|
Per the plans the maximum storage height is 16'. Upon inspection the storage is at 21'6". Need height monitoring system as discussed.
|