BLD08-02306
| FIRE-Final Inspection | 11/4/2008 | 11/6/2008 | 11/7/2008 8:00:50 AM | P | PASS |
|
|
Fire life safety passed inspection. NOTE: An attatched fire alarm permit for a door hold does not appear to be related to the scope of this project.
|
BLD08-01464
| FIRE-Final Inspection | 11/5/2008 | 11/6/2008 | 11/6/2008 4:52:57 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR08-00332
| INSP-Final Inspection | 11/5/2008 | 11/6/2008 | 11/6/2008 3:48:34 PM | A | FAIL |
|
|
See locations marked on cleanroom plan copies for areas in need of adjustment due to heads obstructed by adjacent equipment and supports at the ceilings.
|
FIR08-00744
| INSP-Sprinkler Rough-in/Hydro | 11/6/2008 | 11/6/2008 | 11/6/2008 3:34:54 PM | P | PART |
|
|
New piping and heads at the sheetrock ceilings are okay for cover, noted two existing upright heads in need of replacement due to paint on the elements and frames.
|
FIR07-00899
| INSP-Sprinkler Rough-in/Hydro | 10/31/2008 | 11/6/2008 | 11/6/2008 2:41:05 PM | A | PART |
|
|
Fire sprinkler modifications per the scope of work indicated are acceptable per stamped plans, final pending seismic bracing completion at the reconfigured riser.
|
FIR08-00515
| FIR-Aging Inspection | 11/6/2008 | 11/6/2008 | 11/6/2008 2:38:31 PM | | DONE |
|
|
Work in progress
|
FIR08-00565
| INSP-Sprinkler Rough-in | 11/6/2008 | 11/6/2008 | 11/6/2008 2:38:08 PM | P | PART |
|
|
Overhead system modifications okayed for cover at the drop ceilings-see red line notes on plans. One obstruction relocated while on site.
|
FIR08-00566
| INSP-Sprinkler Rough-in | 11/6/2008 | 11/6/2008 | 11/6/2008 2:35:59 PM | P | DEFR |
|
|
Not yet completed for inspection at this time, request intended for 3rd floor permit work.
|
FIR08-00698
| INSP-Final Inspection | 11/5/2008 | 11/6/2008 | 11/6/2008 2:34:30 PM | A | FAIL |
|
|
The new pendent head at the hood is overspaced-see approved plans for correct spacing.
|